Similar Projects
2021 Bridge 27263 3rd Street Painting and Repairs
Results
Minneapolis, MN

Sandblasting and Electrostatic Painting Services
Term Contract
Post-Bid
MN

Juvenile Service Center Pod 1, and Pod 4 Painting
Post-Bid
Hastings, MN 55033

Water Storage Tank Repair and Repair
Infrastructure, Alteration
Post-Bid
Rochester, MN 55901

Gap - Refresh
Renovation
Post-Bid
Maple Grove, MN

2020 Terminal 1 Tram System Upgrade P6
Results
Less than $1,379,933 est. value
Saint Paul, MN 55111

Repainting Exterior Guard Rails and Exterior Corridor Floors
Alteration
Post-Bid
Montevideo, MN

Wood Sandblast Engraving for Bench Tops for MPRB Board
Alteration
Post-Bid
Minneapolis, MN

Cope Avenue Tank Repairing and Painting
Results
Saint Paul, MN 55109

Interior Painting Project John Carroll Apartments
Post-Bid
South Saint Paul, MN 55075

Repainting of Concrete Exterior to the Bellanca Building
Results
Alexandria, MN 56308

Miscellaneous Painting, Patching and Taping Services
Term Contract
Post-Bid
Duluth, MN 55811

Municipal Building Commission Painting Services
Term Contract
Post-Bid
Minneapolis, MN

Painting and Wallcovering Services
Term Contract
Post-Bid
MN

Last Updated 09/03/2021 02:15 AM
Project Title

Zachary Water Treatment Plant Coatings Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Plymouth, MN   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the furnishing of all labor and materials for the construction, complete in-place, of the following: A. Abrasive blast existing coatings on existing filter cell walls and leave filter walls uncoated to reduce long term maintenance. B. Topcoat over existing coatings on walls and ceilings. C. Abrasive blast existing coatings on existing ventilation air ducts in filter cells and leave ducts uncoated to reduce long term maintenance. D. Abrasive blast and recoat existing carbon steel surfaces on filter center column distributor boxes and filter piping with two-part epoxy coatings. E. Abrasive blast existing coatings on most all existing process piping throughout the plant and repaint with two-part epoxy coatings. F. Provide surface preparation of all existing floor coatings throughout the plant and install a new epoxy flooring system. G. Brush-off blast and coat existing process piping, valves, fittings, and pipe supports throughout plant. H. Insulate raw water piping in hallway.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents