Similar Projects
Fire Station
New Construction
Conception
McQueeney, TX 78123

New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station 6
New Construction
Design
$9,945,000 est. value
Allen, TX 75013

EMS & Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

Design Build Construction Services
New Construction
Bidding
$5,300,000 est. value
Seagoville, TX 75159

Fire and Police Training Center
New Construction
Bidding
Longview, TX

Fire Station #1 and Fire Prevention Building Re-Build
New Construction, Demolition - 17,678 SF
Sub-Bidding
$8,900,000 est. value
Arlington, TX 76010

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

New Royse City Fire Station No 1
New Construction - 10,500 SF
Post-Bid
$4,350,000 est. value
Royse City, TX 75189

Fort Bend County Emergency Services District No. 6 Fire Station No. 1
New Construction - 7,590 SF
Results
Richmond, TX 77469

Design/Build Proposals Cove Fire Station
Results
Less than $487,882 est. value
Cove, TX 77523

Fire Station 6
Construction
League City, TX

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Public Safety Building Expansion
Addition
Conception
Mansfield, TX 76063

Police Weapons Range New Classroom Building
New Construction
Design
$630,000 est. value
Waco, TX 76708

Last Updated 08/04/2021 11:42 AM
Project Title

Police Headquarters

Physical Address View project details and contacts
City, State (County) Lubbock, TX 79401   (Lubbock County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New police headquarters building totaling 50,600 square feet. Work includes vertical building construction, site work, landscape work, paving and site utilities. Site utilities will include new underground electrical and plumbing work. Site paving will include traffic rated asphalt paving and sidewalks. New construction will have an exterior walls assembly of cold formed metal studs, sheathing, liquid applied air barrier, rigid insulation, face brick, terra cotta panels, and ACM panels. Roofing construction will consist of structural steel framing and steel deck covered by rigid roof and tapered insulation and a TPO roofing membrane. Interior systems will include but not limited to drywall partitions, suspended drywall and lay-in ceilings, miscellaneous metals, ceramic tile, flooring finishes and glazed demountable partitions.

Details

Fire/Police Station, New Construction, 1 Fire/Police Station, 3 Stories Above Grade, Approximately 50,600 SF Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents