Similar Projects
Last Updated | 01/06/2022 03:47 PM |
Project Title | Delta Gamma House - BP 1 - Early Demolition and Abatement |
Physical Address | View project details and contacts |
City, State (County) | Lexington, KY 40508 (Fayette County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Demolition |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work shall include all work indicated in the Work Category Description early demolition & abatement, and Division 01 General Requirements and Division 02 Existing Conditions. The following items represent specific inclusions in this Contract early demolition & abatement. They are provided as a guide to aid in the assignment of work and in no way should be construed as being all inclusive. TRADE PACKAGE 1: EARLY DEMOLITION & ABATEMENT 1. This subcontractor is responsible for all layout/surveying associated with this work. 2. This subcontractor is responsible for all cleanup associated with this work. 3. This subcontractor is responsible for coordination with all other subs on this project as it relates to this scope of work. 4. This subcontractor is responsible for all permits, fees, and inspections associated with this work. 5. This subcontractor is responsible for providing as much dumpster yardage as necessary for this work. 6. This subcontractor is responsible for providing and maintaining temporary toilets and hand washing stations throughout the course of this work. 7. This subcontractor is responsible for providing any signage needed on the project. 8. This subcontractor is responsible for the final cleaning on the project upon the completion of this work. 9. This subcontractor is responsible for the temporary fence and tree protection as shown on the logistics plan for the duration of this work. 10. This subcontractor is responsible for all demo on the project. 11. This subcontractor is responsible for any temporary enclosures or safety barricades needed throughout this work. This work will also include keeping window and door openings enclosed throughout the duration of this work. 12. There is only one bid package. This subcontractor is responsible for all work associated with the contract drawings and specifications, NO EXCEPTIONS. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |