Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

Muscatine Avenue Pedestrian Crossing
New Construction, Infrastructure
Bidding
Less than $88,000 est. value
Iowa City, IA

Crossroads Park Parking Lot and Water Quality Improvements
Infrastructure
Bidding
West Des Moines, IA 50266

Booneville Road - South 100th Street to South 115th Street
Infrastructure
Post-Bid
West Des Moines, IA

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

West Elm and North Vine Street Improvements
Results
$553,988 est. value
West Union, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Freight House West Ramp Repairs
Infrastructure, Alteration
Bidding
Davenport, IA

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

Tower Terrace Road from Miller Road to I-380
Conception
$1,500,000 est. value
Cedar Rapids, IA

2021 Alley Reconstruction Project
Infrastructure
Bidding
Clear Lake, IA

Mount Vernon Business 30 Resurfacing and Improvements
Infrastructure
Post-Bid
Mount Vernon, IA

Last Updated 08/30/2021 09:39 AM
Project Title

2021 Permeable Alley

Physical Address View project details and contacts
City, State (County) Cedar Falls, IA   (Black Hawk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $107,175
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the installation of one full permeable alleys and a full P.C.C alleyway. Work shall include a combination of excavation and backfill of the alley areas; removal of driveway and sidewalk; sub drain; removal and replacement of PCC curb & gutter; placement of storage and filter aggregate; permeable interlocking clay brick paver installation, seeding, and concrete or gravel driveway replacement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents