Similar Projects
Dorchester Terrace Sewer Replacement
Infrastructure
Bidding
North Charleston, SC

P2904 Sprinkler System for Residential Group Home
Post-Bid
$8,000 to $13,000 est. value
Charleston, SC 29403

Line Cleaning and Televising
Post-Bid
Mount Pleasant, SC

Utilities Locating Services for TTC 2020
Results
Charleston, Hollywood, Moncks Corner, North Charleston, Saint George, SC

Pump Station 20 Force Main Extension
Results
Isle of Palms, SC 29451

Street Sanitary Sewer Replacement
Post-Bid
$30,000 to $70,000 est. value
Charleston, SC 29403

Installation of Residential Septic Systems (15 Sites)
Results
North Charleston, SC 29405

Halsey Street Wastewater Improvements Project
Infrastructure
Post-Bid
Charleston, SC 29401

Park West Sewer Rehabilitation Project
Results
Mount Pleasant, SC 29464

24 Inch Sanitary Sewer Replacement Project
Infrastructure
Post-Bid
North Charleston, SC

Installation of Residential Septic Systems (11 Sites)
Results
North Charleston, SC

JIPSD Phase-4, Wastewater Collection Rehabilitation Project
Infrastructure
Post-Bid
James Island, SC

Z--Improve Drainfield
Results
$500,000 to $1,000,000 est. value
SC 29412

Aerial Sewer/Water Repairs
Infrastructure
Post-Bid
North Charleston, SC

FY21 Manhole Rehabilitation
Results
North Charleston, SC 29418

Reported 01/26/2022 12:00 AM
Project Title

FY21-FY22 Trenchless Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Mount Pleasant, SC   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Cleaning and televising approximately 19,000 feet of 8” to 18” sewer; lining approximately 19,000 feet of 8” to 18” sanitary sewers and 140 service laterals with cured-in-place pipe lining and performing all associated work including removing protruding service laterals, re-connecting active service laterals to the lining and performing product tests; rehabilitating approximately 4,300 vertical feet of manholes using an approved specialized cementitious mortar product, rebuilding existing benches and inverts, building concrete slides in manholes, sealing specific infiltration leaks through manhole walls, installing internal drop connections, and plugging abandoned sewers inside manholes with concrete where directed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents