Similar Projects
Water - Planning Western Intake and Plant - Chatham County
New Construction, Infrastructure
Conception
$6,201,099 CJ est. value
Pittsboro, NC 27312

Schools - Wastewater Replacement at Silk Hope School - Chatham County
Infrastructure
Conception
$585,000 CJ est. value
Siler City, NC 27344

Friendship Village Multi-Residential Development / Apex
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Apex, NC 27502

Chatham Park Encore Community
New Construction, Infrastructure
Design
$115,000,000 CJ est. value
Pittsboro, NC 27312

Asphalt Surface Treatment
Infrastructure
Bidding
$1,000,000 CJ est. value
Siler City, NC 27344

Asphalt Surface Treatment
Infrastructure
Bidding
$1,000,000 CJ est. value
Siler City, NC 27344

2022 Pavement Preservation
Infrastructure
Post-Bid
$1,000,000 est. value
Apex, NC

RFQ D/B - Highway Construction in Moncure, Chatham County
Infrastructure
Post-Bid
$900,000 est. value
Pittsboro, NC

Intersection Improvement NC 751 and SR 1731
Infrastructure
Results
NC

Microsurfacing Treatment
Infrastructure
Results
$765,330 CJ est. value
Apex, NC 27523

The Oak View at Siler City Apartments
New Construction, Infrastructure
Construction
$12,500,000 CJ est. value
Siler City, NC 27344

John Palmour Manufacturing Center for Silicon Carbide
New Construction, Infrastructure - 1,000,000 SF
Construction
$2,500,000,000 CJ est. value
Siler City, NC 27344

Project Real
New Construction, Infrastructure - 150,000 SF
Pending Verification
$16,000,000 CJ est. value
Apex, NC 27502

Mellott Mixed Use
New Construction, Infrastructure - 785,000 SF
Pending Verification
$700,000,000 CJ est. value
Pittsboro, NC 27312

Vickers Village
New Construction, Infrastructure - 20,000 SF
Conception
$70,000,000 CJ est. value
Pittsboro, NC 27312

Last Updated 01/03/2024 04:03 PM
Project Title

VinFast Electric Vehicle Manufacturing Facility - Triangle Innovation Point East

Physical Address View project details and contacts
City, State (County) Moncure, NC 27559   (Chatham County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing, Sewer and Water
Sub-Category(s) Gas Station, Industrial Warehouse, Lift and Pump Stations, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Seeking Site Plan Approvals, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $4,000,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work, paving, outdoor lighting and new construction a 955,000 square-foot manufacturing facility, an 800,000 square-foot service station / car wash facility, a 513,200 square-foot manufacturing facility, a 497,950 square foot manufacturing facility, a 33,900 square-foot manufacturing facility, an 8,200 square-foot manufacturing facility, an 800-square-foot water / sewer project and a 288-square-foot manufacturing facility. As of January 3, 2024, site plans have been submitted to Chatham County. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set, however construction is not expected to begin prior to summer 2025.

Details

,, 2,809,338 SF - 955,000 SF. 800,000 SF. 513,200 SF. 497,950 SF. 33,900 SF. 8,200 SF. 800 SF. 288 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents