Similar Projects
Construction of Port of Entry Fire Line, Tank, and Booster Pump Station
Post-Bid
Columbus, NM 88029

Construction of Lift Station Improvements
Post-Bid
Estancia, NM 87016

Wastewater Lift Station Maintenance and Repair Services
Results
Las Cruces, NM 88007

Tank 4 to Tank 1 Booster Pump Station and Transmission Line
Results
Santa Fe, NM 87508

Band Replace Sewer and Water System
Post-Bid
$500,000 to $1,000,000 est. value
Los Alamos, NM 87544

Valley Water and Sanitation District Booster Station
Results
Kirtland, NM 87417

Goat Summit Booster Station
Post-Bid
Mescalero, NM

Metro Verde Lift Station
Results
Las Cruces, NM 88004

Lift Stations and Forcemains
New Construction
Post-Bid
Ruidoso, NM 88345

Vado Lift Stations #4 and #5 Rehabilitation Project
Results
Las Cruces, NM 88007

Construction of Pond J Liner Improvements Coyote del Malpais Golf Course Grants
Results
Grants, NM 87020

3358 Housing Warehouse Lift Station Removal
Results
Las Cruces, NM 88003

Lift Station No. 12 & 14 Improvements
Results
$467,203 est. value
Farmington, NM 87401

Overlook Park Non-Potable Water Booster Station Project
Results
Los Alamos, NM 87544

Detention Center Lift Station Improvement
Results
$226,694 est. value
Las Vegas, NM 87701

Last Updated 08/27/2021 06:46 PM
Project Title

Improvements to Municipal Well #9 Project

Physical Address View project details and contacts
City, State (County) Clayton, NM   (Union County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall generally consist of: Selective demolition of existing building electrical and equipment, with protection of existing heater and SCADA for re-location; Installation of a new prefabricated pump house building; re-installation of existing electric unit heater and SCADA system in new building; installation of new pipe gallery in new pump house; installation of new fencing for new building; replace the existing raw waterline from the new pump house to the treatment system (approx. 2,140 linear feet of 8" C900 PVC); abandon existing 10" AC waterline.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents