Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$45,000,000 CJ est. value
Edwardsville, IL 62025

Smith Lake Drainage Improvements - City of Wood River
Infrastructure
Conception
$1,900,000 CJ est. value
Wood River, IL 62095

Installation of a Second Water Meeting from Bethalto Water to Moreland Road
Infrastructure
Design
$1,750,000 CJ est. value
Bethalto, IL 62010

Installation of a Second Water Meeting from Bethalto Water to Moreland Road
Infrastructure
Design
$1,750,000 CJ est. value
Bethalto, IL 62010

Yellow Hammer Trail
Infrastructure
Bidding
$500,000 CJ est. value
Pontoon Beach, IL 62040

Full Depth Hot-mix Asphalt Shoulders
Infrastructure
Bidding
$4,500,000 CJ est. value
Alhambra, IL 62001

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Water Main Materials-Phase 2
Alteration
Post-Bid
Edwardsville, IL 62025

West Dunn Street Improvements
Infrastructure
Results
Edwardsville, IL 62025

Removal and Replacement of the Existing Deteriorating Portland
Infrastructure
Results
Granite City, IL

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Addition and Renovation Dorris Intermediate School
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Construction
$6,000,000 CJ est. value
Collinsville, IL 62234

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

Uptown Scoops
Demolition, New Construction, Infrastructure - 7,700 SF
Pending Verification
$1,000,000 CJ est. value
Collinsville, IL 62234

Water Meters / Wood River
Infrastructure
Conception
$853,058 CJ est. value
Wood River, IL 62095

Last Updated 06/27/2023 01:28 PM
Project Title

Sanitary Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Marine, IL 62061   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $316,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements to the Sanitary Sewer System include point repairs, the CIPP lining of 16,000 feet of 8" sewer line, service lateral grouting, manhole lining, manhole replacement, and other various repairs to the sewer system. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4." The Village of Marine reserves the right to accept or reject any or all bids and to waive any informality in any bid should it consider same to be in its best interest. Bids may not be withdrawn for a period of ninety (90) days after the bid opening. All work will be constructed in accordance with the "Standard Specifications for Water and Sewer Main Construction in Illinois", latest edition.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents