Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFP Engineering - Second Creek Farm and Oasis Parks, Trail Fitness Stations and Shade Structures
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Commerce City, CO 80022

Westwood Subdivision Site Development
New Construction
Design
Thornton, CO 80602

Riverdale Regional Park Arena
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Brighton, CO 80601

Request for Contractor Prequalifications
Renovation, Infrastructure
Bidding
Thornton, CO

RFP Engineering - Riverdale Regional Park Collaboration and Operations
Infrastructure
Bidding
$200,000 CJ est. value
Byers, CO 80103

2022 Water System Improvement
Post-Bid
Aurora, CO

2022 PRV Vault Improvement
Post-Bid
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

On Call Construction Services II for Priority Repairs of Water, Wastewater and Stormwater Infrastructure
Results
Aurora, CO

Fitness Center - Site Improvements
Infrastructure
Construction
Commerce City, CO 80022

Kabin 2.0 North and South Buildings
New Construction, Infrastructure - 119,123 SF
Pending Verification
$38,400,000 CJ est. value
Denver, CO 80216

Aurora Commerce Center Buildings A & B
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Aurora, CO 80019

Bubble Time Express Carwash - Grant Street
New Construction, Infrastructure - 3,195 SF
Design
$900,000 CJ est. value
Thornton, CO 80241

Service Street Auto Repair / Broomfield
New Construction, Infrastructure - 4,556 SF
Bidding
$1,700,000 CJ est. value
Broomfield, CO 80020

Last Updated 08/16/2022 06:02 PM
Project Title

Phase I Recycled Water Pipeline - Segment 2

Physical Address View project details and contacts
City, State (County) Bennett, CO 80102   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $597,724 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 1,782 feet of pipe for the recycled water distribution system, including appurtenances. The project includes 196-foot bore and steel casing beneath the UPRR railroad tracks with 12-inch DR11 HDPE pipe, 100-foot bore and HDPE casing beneath Colfax Avenue (CDOT ROW) with 12-inch DR11 HDPE pipe, 70-foot bore beneath Centennial Drive with 12-inch DR11 HDPE pipe, 357 feet of additional 12-inch DR11 HDPE pipe, 1,059 feet of Ownerfurnished 12-inch DR18 C900 PVC pipe, and 40 feet of 2-inch copper pipe and a 2-inch meter vault with a connection to the existing irrigation line. Question Acceptance Deadline 07/04/2022 02:00 PM EDT Questions are submitted online No Piggyback Contract No

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents