Similar Projects
Cherokee National Forest Road Maintenance IDIQ
Term Contract
Design
Del Rio, Tellico Plains, TN 37727

GR Upgrade - SR 1024 to Montour Co Line
Infrastructure
Bidding
$500,000 est. value
Knoxville, TN 37999

Fulton Courtyard - Southwest Tennessee Community College
Infrastructure
Bidding
$300,000 est. value
Memphis, TN 38134

Asphalt Walking Trail
Post-Bid
Greenback, TN

Asphalt - Paving in Place
Term Contract
Post-Bid
TN

St. Elmo Riverwalk 4 Extension
Results
Chattanooga, TN 37409

The Resurfacing on S.R. 141 From Sugar Flat Road (L.M. 14.59) to East of Flat Rock Road (L.M. 21.11)
Results
TN 37087

2021 CDBG Imminent Threat Road Improvement
Infrastructure
Bidding
$400,000 est. value
Tullahoma, TN

Asphalt Bid
Post-Bid
Bolivar, TN

The Resurfacing on I-840 From Leipers Creek Road (L.M. 12.48) to Thompson Station Road (L.M. 18.20)
Results
TN

2022 Asphalt Resurfacing
Infrastructure
Bidding
$3,000,000 est. value
Loudon, TN

Asphalt Materials and Asphalt and Curbing in-Place
Term Contract
Post-Bid
Alcoa, TN

The Resurfacing on S.R. 93 From Near I-26 (L.M. 6.21) to Near U.S. 11W (S.R. 1) (L.M. 11.33), Including Bridge Deck Repair
Results
TN

Grading, Drainage, Signals and Paving on U.S. 127
Infrastructure
Bidding
$300,000 est. value
Crossville, TN 38571

Micro-Surfacing
Term Contract
Post-Bid
Carthage, TN

Last Updated 05/24/2022 01:07 AM
Project Title

Resurfacing on S.R. 52

Physical Address View project details and contacts
City, State (County) (Overton, Pickett Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project No. HSIP-52(96), 67S052-M8-002 (PIN 131748.00), 67S052-F3-002 (PIN 131748.00) The resurfacing on S.R. 52 from near Dogwalk Road (L.M. 18.32) to the Pickett County line (L.M. 24.62). Project Length - 6.300 miles. Project No. STP-52(97), 69S052-F8-002 (PIN 129523.00) The resurfacing on S.R. 52 from the Overton County line (L.M. 0.00) to the Fentress County line (L.M. 2.26). Project Length - 2.260 miles. Total Contract Length - 8.560 miles

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents