Similar Projects
Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Road Repairs
Term Contract
Post-Bid
Antioch, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

Sealcoating and Striping at Various Locations
Results
Lake Zurich, IL

Seymour Alley Reconstruction
Infrastructure
Post-Bid
Mundelein, IL

2021 Road Program
Results
Lake Zurich, IL

Community Park Paving Improvements
Alteration
Post-Bid
Mundelein, IL 60060

Asphalt Pavement and Concrete Sidewalk Repairs
Results
Libertyville, IL 60048

Cleaning and Painting of Steel Bridge Structures at 3 Locations
Infrastructure
Post-Bid
Deerfield, Des Plaines, Highland Park, Northbrook, IL 60062

2021 Street Maintenance
Results
IL

Soil Preparation at Grant Woods Forest Preserve
Infrastructure
Post-Bid
Ingleside, IL 60041

RR-21-4575R - Plaza Improvements
Results

Shoreline Stabilization/Landscape Restoration
Infrastructure
Post-Bid
Mundelein, IL 60060

Last Updated 10/12/2022 12:08 AM
Project Title

Pavement Removal, Resurfacing, Patching

Physical Address View project details and contacts
City, State (County) Libertyville, IL 60048   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $781,374 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of pavement removal, resurfacing, patching, and the replacement of an existing triple-cell 60" CMP culvert with a precast box culvert. The roadway shoulders will be widened to provide 4' bicycle-friendly shoulders. Additional pipe culvert removal and replacing, ditch grading, and other related work are also included. To bid on this project, contractors shall be required to obtain an approved LCDOT Authorization to Bid Project Location: The Lake County Facility is located at: 600 W. Winchester Road, Libertyville, IL 60048 Phone (847) 377-7498 Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Pavement Removal, Resurfacing, Patching 21-00176-06-DR

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents