Project Title | PennDOT - Development of New Stockpile, Dauphin County |
Physical Address | View project details and contacts |
City, State (County) | Grantville, PA 17028 (Dauphin County) |
Category(s) | Heavy and Highway, Industrial/Manufacturing |
Sub-Category(s) | Industrial Warehouse, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected January 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1, & #2) SDB = 8% VBE = 3% .2 HVAC Construction - ALL BASE BIDS (#1, & #2) SDB = NA VBE = NA .3 Plumbing Construction - ALL BASE BIDS (#1, & #2) SDB = NA VBE = NA .4 Electrical Construction ALL BASE BIDS (#1, & #2) SDB = NA VBE = NA Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. Contract No. DGS 0251-0061 PHASE 1.1 - General Construction Contract No. DGS 0251-0061 PHASE 1.2- HVAC Construction Contract No. DGS 0251-0061 PHASE 1.3 - Plumbing Construction Contract No. DGS 0251-0061 PHASE 1.4 - Electrical Construction A. Demolition of existing slab on grade, footings, utilities and appurtenances of former restaurant building General site demolition of curbs, plantings and hardscape Site regrading Bituminous paving overlay and full depth replacement Miscellaneous site improvements Parking for fleet and personnel vehicles New site lighting Chain link site perimeter fencing, vehicle and man gates New 850 SF Personnel Staging Building (office) New 4,500 SF glulam-framed three-bay salt storage barn and adjacent liquid brine distribution facility New 200 SF pre-engineered metal storage building New PV array and support tracking rack New EV electric vehicle charging station Heat pump for heating and cooling of Personal Staging Building Interior finishes A. The Work of this Project consists of, but is not necessarily limited to, the following. Detailed requirements of the Work are described in the pertinent specification Sections and/or shown on the Drawings. B. General Construction (.1) Contract: 1. Site demolition of existing slab on grade, footings, utilities, piping, grease interceptor and well pump and wiring. 2. Site improvements including paving, mill and overlay, striping, regrading, fencing and gates, guardrail. 3. Construction of new 4,500 SF glulam framed salt storage facility including all miscellaneous blocking and unistrut / allthread support framing for piping and all miscellaneous framing. 4. Construction of new 850 SF Personal Staging Building. 5. Construction of foundation for and provision of new 200 SF pre-engineered metal storage building. 6. Footing for support of new photovoltaic support rack. 7. Power operated gate, motors and controls. C. HVAC Construction (.2) Contract: Note: All HVAC Construction is at the Personnel Staging Building 1.New heat pump for heating and cooling 2. Interior ductwork air distribution system 3. HVAC controls and wiring 4. Grilles, diffusers, registers 5. Exhaust fans D. Plumbing Construction (.3) Contract: 1. Water service piping from well to Personnel Staging Building 2. Electric water heater 3. Interior plumbing distribution piping 4. Plumbing fixtures and trim 5. Storage containers, pump and piping package for brine station including pipe roller supports. E. Electrical Construction (.4) Contract: 1. New service from transformer to panel 2. Interior distribution panel and two exterior site panels 3. Interior and exterior site, lighting and power wiring and conduits, including all low voltage wiring and controls. 4. Low voltage wiring 5. Lighting fixtures for all buildings 6. Power outlets 7. Data jacks 8. Data racks and mounting 9. Site lighting with 25' poles and fixtures 10. Exterior building mounted lighting 11. PV array for all Base Bids 12. EV charger station 13. Twist Lock outlets at the trucks parking and at the Salt building 14. Power to HVAC and pumps (well & brine tanks) 15. Power and low voltage control wiring for power operated gate |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |