Similar Projects
Schrenk Hall Addition and Renovation - Phase III (Biosciences Building) - Missouri University of Science and Technology
Addition, Renovation, Infrastructure - 108,000 SF
Conception
$52,040,100 CJ est. value
Rolla, MO 65409

Schrenk Hall Addition and Renovation - Phase III (Biosciences Building) - Missouri University of Science and Technology
Addition, Renovation, Infrastructure - 108,000 SF
Conception
$52,040,100 CJ est. value
Rolla, MO 65409

Dangerous Materials Storage Facility
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Rolla, MO 65401

Concrete and Asphalt Cutting
Infrastructure
Post-Bid
$300,000 CJ est. value
Rolla, MO 65401

Missouri University of Science & Technology Student Experience Center
New Construction, Infrastructure - 50,000 SF
Post-Bid
$26,000,000 CJ est. value
Rolla, MO 65401

Kummer Foundation Executive Board Room Phase 2
Renovation
Results
$922,836 est. value
Rolla, MO 65409

Geothermal Wellfield #4
Infrastructure
Results
$3,060,000 CJ est. value
Rolla, MO 65401

Parking Lot H - Expansion and Improvements - Phase II
Infrastructure
Construction
$1,018,647 CJ est. value
Rolla, MO 65409

Engineering Research Lab (ERL) Addition and Renovation - Missouri University of Science and Technology
Addition, Renovation, Infrastructure - 86,470 SF
Conception
$43,026,000 CJ est. value
Rolla, MO 65409

Mark Twain National Forest Toilets
Demolition, New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Rolla, MO 65401

Arrival Court - Phase One Grading Plan
Infrastructure
Results
$1,157,410 CJ est. value
Rolla, MO 65401

Route 63 EIS Re-Evaluation Corridor Improvements
Infrastructure
Post-Bid
$201,047,000 CJ est. value
Rolla, MO 65401

Small Structure Replacement Program Project
Infrastructure
Results
$154,429 CJ est. value
Rolla, MO 65401

Missouri Protoplex
New Construction, Infrastructure - 116,000 SF
Post-Bid
$53,482,758 CJ est. value
Rolla, MO 65401

Hypoint South Renovation
Renovation - 15,907 SF
Results
$866,000 CJ est. value
Rolla, MO 65401

Last Updated 06/20/2023 12:04 PM
Project Title

Arrival Court - Phase Two Site Work

Physical Address View project details and contacts
City, State (County) Rolla, MO 65409   (Phelps County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $5,900,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A download is available for a (nonrefundable) purchase. Neither owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda (if any) obtained from sources other than the issuing office. All Contract Documents must be obtained by the Bidder from ADS to be an Eligible Bidder. The Contractor shall have as a goal, subcontracting with Minority Business Enterprise (MBE) of ten percent (10%), with Service Disabled Veteran Owned Business (SDVE) of three percent (3%); and with Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and/or Veteran Owned Business of ten percent (10%) of awarded contract price for work to be performed. Questions regarding the scope of work and commercial conditions should be directed to Pat Litty at (573) 341-4865 or littyp@mst.edu Information regarding bid results will be available the day following the bid opening by calling (573) 341-7618. The Owner reserves the right to waive informalities in bids and to reject any and all bids. Construction Estimate: $5,900,000.00 Base Bid The scope of work to be performed for this project includes: o Localized demolition of existing drives, pavement, landscape, and site features to prepare for construction of site work. o Earthwork necessary to bring the project area to rough grade for the future site improvements, including but not limited to procuring, placing, and compacting specified soil. o Raising or lowering of existing utility manholes, lids, valves, and similar utility structures to proposed finish grades. o Installation of new drainage utilities related to site work. Soil placement and site work installation atop subsurface parking garage. o Erosion control and stormwater pollution prevention for all disturbed areas within the project area. Scope of work also includes protection of existing trees to remain and protect from damage during construction activities. o Finish grading, site walls, hardscape pavements (vehicular and pedestrian), landscape irrigation, soil preparation, planting. o Site lighting and associated electric work. General Description of Work: The Arrival Court Phase Two Site Work project consists of all site improvements to finalize the spaces between buildings and the overall transformed Arrival District of Missouri S&T's campus. The improvements consist of a vehicular forecourt, pedestrian entry plaza, large formal oval for campus events, events plaza nestled between the new Student Experience Center and new Welcome Center, and additional landscape, lighting, and pedestrian and vehicular connections. (1) Project consists of construction of vehicular roads, pedestrian paths, stairs, site walls, site lighting, site electrical, and landscape (soils, planting, irrigation) as indicated on plans and specifications. (2) Demolition shall consist of removal and proper disposal and/or salvaging of existing pavement, curbs, vegetation, trees, signage, lighting, irrigation, and other physical built improvements in the project areas as noted on project bid documents. (3) Earthwork and Grading work shall consist of installing and maintaining erosion control and stormwater pollution prevention measures, procuring/hauling/placing/compacting of suitable soils to grades indicated on plans and specifications. (4) Utility work shall consist of raising or lowering of utility structures, including but not limited to manholes, lids, valves, handholes, or other underground or at grade utility enclosures as noted on project bid documents. Utility work also includes installation of decorative utility covers, drainage pipe and drain covers per drawings and specifications. (5) Structural work shall consist of concrete footings for light poles and structurally designed concrete slabs. (6) Electrical work shall consist of site electrical, site lighting, irrigation electrical, and heat tape./snow melt. (7) Landscape work shall consist of soil preparation, procurement and installation of trees, shrubs, perennials, grasses, and groundcovers, installation of turf grass sod, turf seed, reinforced turf, and subsurface irrigation systems. (8) Hardscape/Flat Work shall consist of concrete paving, decorative concrete paving, unit paving, asphalt paving, and crushed stone paving. (9) Metal work shall consist of handrails, guard rails, and fencing. . LOCATION Work shall be performed under this Contract on campus of Missouri University of Science and Technology, in four locations east of 63 highway and within 8 acres of the campus titled as the ARRIVAL COURT-PHASE TWO SITE WORK.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents