Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Boundary Channel Drive at I-395 Interchange
Bidding
Less than $15,000,000 est. value
Arlington, VA 22202

18th Street South Street Improvement Project
Bidding
$500,000 to $749,999 est. value
Arlington, VA 22201

Arlington National Cemetery
Post-Bid
$50,000,000 est. value
Arlington, VA

ANC Road Construction
Post-Bid
$50,000 to $15,000,000 est. value
Arlington, VA

Route 29 (Lee Highway) at Route 120 (North Glebe Road) Intersection Improvements
Results
Arlington, VA 22201

Flexible Porous Paving
Results
VA

Streetscape Improvements at the Intersection of North Pershing and Washington Boulevard
Post-Bid
Arlington, VA 22200

2020 Latex Modified
Results
Less than $2,949,000 est. value

23rd Street South Phase 1 Street Improvements
Results
Arlington, VA 22201

2020 Plant Mix
Results
Less than $4,188,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Parking Lot Repaving
Results
Arlington, VA

2020 Plant Mix
Results
Less than $4,936,000 est. value

Water Activated Cold Patch
Term Contract
Results

Last Updated 06/15/2020 02:35 PM
Project Title

ANC McPherson Area Road Reconstruction

Physical Address View project details and contacts
City, State (County) Arlington, VA   (Arlington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Arlington National Cemetery - McPherson Area Roads Reconstruction Project: Project includes replacing approximately 9,500LF of existing curbs & gutters, roadway, sub grade, inlets, drain pipes, and necessary under drains on the south-west area of the cemetery. Associated roads include: McPherson Drive, Farragut Drive, Jackson Circle, Lawton Drive, Capron Drive, McKinley Drive, Miles Drive, Hobson Drive, and section of Grant Drive. Scope also includes intersection of adjacent roads up to the nearest drain inlet, as required to facilitate drain line work, and storm water drain line replacement. New conduit and hand hole boxes shall be installed for a future WI-FI system. Finishing grading and sod shall be installed on all disturbed areas. Drain lines, drain inlets, manholes, and roadway reconstructed to current VDOT standards or as otherwise specified by ANC requirements. Care must be taken to protect trees and root systems along the roadways. Staging areas shall be within the construction areas. Implement Project Phasing that will minimize impacts pedestrian traffic and cemetery operations. ANC is not only our Nations Most Sacred Shrine but is also now a Nationally-recognized Level III Arboretum so the quality of landscape materials and installation is a critical success factor.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents