Similar Projects
Expansion Fire Medical Station Number 6 - City of Lawrence
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Lawrence, KS 66044

Pump Station 16 Upstream Interceptor Rehab - MS-21-0022 - City of Lawrence
Infrastructure
Conception
$1,170,000 CJ est. value
Lawrence, KS 66044

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

City of Lawrence Field Operations Campus
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Lawrence, KS 66044

2023 Playground Modernizations at the 49-02 Site
Infrastructure
Bidding
$425,000 CJ est. value
Iola, KS 66749

Infantry Substation Sanitary Sewer Relocation
Infrastructure
Bidding
$136,000 CJ est. value
Fort Scott, KS 66701

Great Bend Police Station and Court Facility
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Great Bend, KS 67530

Valvoline Instant Oil Change / Lawrence
Demolition, New Construction, Infrastructure - 2,025 SF
Post-Bid
$1,100,000 CJ est. value
Lawrence, KS 66046

Farlington Fish Hatchery Addition
Addition, Demolition, Infrastructure
Results
$571,848 CJ est. value
Farlington, KS 66734

Lawrence Multimodal Transfer Center
New Construction, Infrastructure
Results
$3,838,960 CJ est. value
Lawrence, KS 66049

Berry Global Addition
Addition, Demolition, Infrastructure
Construction
$1,500,000 CJ est. value
Lawrence, KS 66049

Schlumberger / Lawrence
Addition, New Construction, Infrastructure - 1,300 SF
Construction
$700,000 CJ est. value
Lawrence, KS 66049

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

Plastikon Healthcare Expansion
Addition, Infrastructure - 17,000 SF
Pending Verification
$1,200,000 CJ est. value
Lawrence, KS 66046

Kaw WTP Infrastructure Rehab - MS-22-0032 - City of Lawrence
Renovation
Conception
$4,216,000 CJ est. value
Lawrence, KS 66044

Last Updated 07/11/2023 03:52 PM
Project Title

Wastewater Lagoon/ Wetland Treatment

Physical Address View project details and contacts
City, State (County) Marysville, KS 66508   (Marshall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction of a new 18+ acre Primary Lagoon Cell at the existing Wastewater Lagoon Treatment Site, Construction of a new 14+ acre Final Disposal Wetland Cell at the identified site, associated structures & piping, grading, and seeding-cleanup. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The cost of printed Bidding Documents from the Issuing Office will depend on the number and size of the Drawings and Project Manual, applicable taxes, and shipping method selected by the prospective Bidder. Cost of Bidding Documents and shipping is non-refundable. Contract Documents will be shipped only if the requesting party assumes responsibility for all related shipping charges. Non-refundable corporate, certified, or cashier's checks shall be made payable to Drexel Technologies. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of the Bidding Documents will not be available from the Issuing Office. Additional assistance is available at distribution@drexeltech.com. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, bonding requirements, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. No bidder may withdraw his bid within 30 days after the actual date of the opening thereof. All persons awarded and /or entering into contracts with the Owner shall be subject to and required to comply with applicable county, state and federal provisions pertaining to nondiscrimination, labor standards, equal employment opportunity and affirmative action on public contracts. The project is being partially funded by Small Cities Community Development Block Grant Program managed by the Kansas Department of Commerce. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and Federal prevailing wage rates to be paid under the contract, Section 3 of the 1968 Housing Act, Segregated Facility, Section 109 of the 1984 Housing and Community Development Act, the Civil Rights Act of 1964 and Executive Order 11246. Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Disadvantaged Business Enterprises (DBE) are encouraged to submit bids for this work. American Iron and Steel: Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, and Pig iron and direct reduced iron Bidders on this work will be required to comply with the presidents Executive Order No. 11246 (Equal Employment Opportunity) as amended. Requirements for bidders and contractors under this order are explained in the specifications. "Bidders must fully comply with Subpart C of 2 CFR Part 180 and 2 CFR Part 1532, entitled Responsibilities of Participants Regarding Transactions. Contractors, subcontractors, or suppliers that appear on the Excluded Parties List System at www.sam.gov are not eligible for award of any contracts funded by the KDHE State Revolving Fund programs." All contracts and subcontracts exceeding $100,000, at any tier under a SRF Loan Agreement shall comply with the Anti-Lobbying Act, Section 319 of Public Law 101-121, and file an Anti-Lobbying Certification form, and the Disclosure of Lobbying Activities form, if required, to the next tier above. The Owner reserves the right to reject any and all bids and to waive any irregularities therein.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents