Similar Projects
Bulk Road Salt
Term Contract
Post-Bid
Raleigh, NC

Rootzone Sand/Peat Mix
Term Contract
Post-Bid
Cary, NC

Great Smoky Mts. NP Road GRAVEL
Results

ABC Stone for Chowan Swamp Project
Results
Less than $34,969 est. value
Raleigh, NC 27699

Biosoil
Post-Bid
Raleigh, NC

Topsoil, Compost
Post-Bid
Raleigh, NC

Sand and Aggregates
Post-Bid
Raleigh, NC

ABC Stone for Little Beaver Project
Post-Bid
New Hill, NC

4A Railroad Ballast Stone For Juniper Project
Post-Bid
Raleigh, NC 27699

Three Types of Stone for Old Highway 601 Project
Post-Bid
Raleigh, NC 27699

Three Types of Stone for Juniper Project
Post-Bid
Raleigh, NC 27699

ABC Stone for Buck Ridge Project
Post-Bid
Raleigh, NC 27699

ABC and #4 Stone for Green Swamp Project
Post-Bid
Raleigh, NC 27699

ABC Stone for Long Ridge Project
Post-Bid
Raleigh, NC 27699

ABC Stone for Riegal Ridge Project
Post-Bid
Raleigh, NC 27699

Reported 02/29/2020 12:00 AM
Project Title

Deployment of Artificial Reef Materials

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1: The inshore project is part of ongoing oyster restoration work at Swan Island Oyster Sanctuary, located near the mouth of Neuse River at 35° 05.746' N, 76° 27.127' W. The site is located approximately 2 nautical miles north of Point of Marsh and has an average depth of 12 feet. Materials for this project will be Class B limestone rip rap. NCDMF is purchasing approximately 10,000 tons of material, which will be delivered to the NCDMF South River Facility. This is approximately 13nm from the reef site. The reef will be constructed in ridges, with the deployment vessel required to hold position precisely while materials are offloaded. Phase 2: Construction will occur at three offshore reef projects in 2020. Two reefs are located approximately 8 miles offshore of Ocracoke and one reef is approximately 15 miles offshore of Topsail. Materials for these projects are located at NCDMF’s South River Facility. Materials for this project include approximately 700 large concrete reef balls, large concrete pipe, and other miscellaneous concrete structures. NCDMF anticipates at least one barge load of concrete materials to each site. Additional loads will be dependent on material acquisition and deployment costs.

Details

Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents