Similar Projects
Reported | 02/21/2021 12:00 AM |
Project Title | Remodeling and Repairs at 3387 North 38th Street |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53216 (Milwaukee County) |
Category(s) | Residential |
Sub-Category(s) | Single-Family Homes |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove and replace the three rotten/damaged timber planters, and replace with matching treated timbers. Use 6x6 treated landscape ties. Replace the existing service door with a metal-clad 36" wide exterior door. Re-frame (widen) the opening as necessary, with structural studs and a header. Install a thumb-turn deadbolt with locking handle. Paint all exposed wood trim work; jambs and brick molding, etc. B.) Install a new security door with a deadbolt and a locking handset. Install sloped threshold extensions to make the door sill accessible for the owner (small ramps up to and over the threshold). Note: All locks are to be matched with one key. Repair or replace all damaged fascia and soffit boards. Wrap the soffit and fascia in pre-finished aluminum wrap. Colors per owner. Wrap all exposed door and window trim in pre- finished sheet metal. Apply color matched oil based sealant at all seams, edges, and over nail heads. Wrap the entire garage in new vinyl siding. Include all necessary moldings, edge/corner beads, and trim work. Color/s per owner. Install a new overhead door with an automatic garage door opener and related GCI electrical receptacle. Perform all electrical work necessary for code compliance. Install PVC trim-boards, and vinyl seals around the door opening. Install house numbers "3387" on the alley side of the garage. Secure loose deck boards with treated deck screws Apply paintable caulking at all gaps and cracks. Scrape, prime paint, and finish paint the strips of exposed wood at the door jambs. Color - to match existing. Remove all wood sash basement windows and paneled (former) window openings, and replace with glass block window units. Windows are to have screened vented openings. (Note: One window will need to accommodate the dryer vent, re-attach the dryer louver and vent after installation.) Quantity - 7, field verify. Replace the existing exterior Bibb with a frost free, anti siphon bib. The bib is located on the East side of the house, next to the front porch. Replace the broken PVC furnace vent, located on the South side of the house, with a downturned PVC elbow, for code compliancy. The contractor is to contact and coordinate with the Milwaukee Health Department to obtain lead testing clearances. The contractor is to conduct all necessary cleaning at the property in order to obtain passing lead swipe tests. Re-attach and secure the loose existing electrical conduit connection, located above the chest freezer. Replace all existing electrical receptacles in the basement with ground fault protected receptacles. Field verify quantity. Re-secure the loose receptacle located at the East end of the basement, near the ceiling. Repair all areas on the first floor with peeling paint; scrape off the loose paint, apply setting-type drywall compound for a smooth uniform finish, then prime paint and finish paint the entire affected surface (wall/ceiling). Noted Areas; A.) The living and dining room ceilings. B.) In the bedroom, repair the ceiling and walls with peeling paint. C.) At the middle hallway wall, near the floor where the wall-paper has been pulled off and plaster exposed, patch and paint the damaged area to encapsulate all loose paint. Remove the existing shower wall tiles, and underlying wall finishes down to the studs. Install solid wood blocking for two (2) grab bars (located per owner), and at the mounting locations of the ADA exposed shower valve/riser unit. Then install furring on the studs (as necessary), 1/2" cement board wall panels, and two coats of Redgard paintable water proofing. Install new black porcelain 4" wall tiles, closely matched to existing, with bullnose tiles at all edges. Install the two grab bars, and color matched silicone sealant at all joints and seams. Install a new single handle shower valve. Install a new accessible-type (ADA) shower riser with spray wand/head. Replace the rusted grab bar next to the toilet. Replace the vinyl kitchen floor (torn), with an owner approved sheet vinyl floor. Install painted shoe moldings at all wall edges, and transition thresholds at all door openings and floor transitions. Install a 10-year sealed-battery combination smoke and carbon monoxide alarm. Install porcelain tiles at the small areas in front of the toilet where tiles are missing. (The tiles are to match thickness/finish as closely as possible.) Replace the existing guardrail with a code compliant guardrail, made with select-grade wood components. Fill all nail/screw holes with putty, and finish paint - color per owner. Secure the loose receptacle next to the North window, at the top of the stairs. Replace the water stained ceiling tiles, adjacent to the chimney, with new ceiling tiles. Match as closely as possible. Replace the damaged (caved in) floor grill with an appropriate floor grill. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |