Similar Projects
Doyle Conner Administration Building HVAC Improvements
Post-Bid
Less than $850,000 est. value
Tallahassee, FL 32399

SOB and HOB, HVAC Cleaning
Post-Bid
Tallahassee, FL

FDOT HVAC Install: Sneads WB Weigh Station
Results

On-Call HVAC Services
Results
Tallahassee, FL 32312

Bryant Building Chiller and Boiler Replacement
Post-Bid
Tallahassee, FL 32399

Florida Geological Survey - HVAC Replacement
Results
Less than $227,480 est. value
Tallahassee, FL 32303

Capitol Complex Window/HVAC Replacement
Post-Bid
Less than $36,000,000 est. value
Tallahassee, FL 32399

FSU Facilities Boiler PM and Minor Repair Services
Results
Tallahassee, FL 32306

Doyle Conner Lab Administration Building Air Distribution Improvements
Post-Bid
Tallahassee, FL 32399

FSU Facilities Chiller PM and Minor Repairs Services
Results
Tallahassee, FL 32306

Florida A and M University Lab 152 Remodel - Fume Hood Installation
Post-Bid
Tallahassee, FL 32310

FSU Facilities and FSU Mag/Lab HVAC PM and Minor Repairs Services
Results
Tallahassee, FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Title and Land Records Vault HVAC System Replacement
Results
Less than $66,591 est. value
Tallahassee, FL 32303

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Last Updated 05/29/2020 01:19 AM
Project Title

FSU Keen Building HVAC Basement Replacement

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32306   (Leon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The objective of this Invitation to Bid (ITB) is to enable Florida State University (FSU) to enter into a purchase order (PO) with a Respondent to provide all labor, materials & equipment necessary to complete the HVAC renovation work at FSU Keen Building Basement. The scope of work consists of the following: 1.Remove AHU-3 & AHU-4. Remove smoke detectors from return and supply ducts. 2.Remove conductors through trough in room 0067. 3.Remove all conduit, junction boxes associated with AHUs, fire alarm, hot water, and chilled water pumps. Pumps to remain. 4.Remove feeder for panel ‘LA2’ and demolish panel ‘LA2’. 5.Remove FCU-73, FCU-74, FCU-75 & FCU-78. Remove conductors to branch tap or panel. 6.Separate equipment ground and neutral conductors in junction box in room 0015. 7.Reroute existing circuits to new panel. 8.Procure and Install new AHU-3 & AHU-4. Replace terminal piping and controls per plan. 9.Procure and Install new FCU-73, FCU-74, FCU-75 & FCU-78. Replace terminal piping and controls per plan. 10.Install Thermal diffusers as per plan. 11.Provide duct mounted smoke detectors in supply duct. 12.Install three new 20A, 1 pole circuit breakers, match existing. 13.Fire alarm components associated with project as per FSU Specifications. 14.Siemens controls associated with the project as per FSU specifications. All work is to be done as specified in the Construction Document. The project is to start upon issuance of the PO and be completed by mid-August 2020. The FSU Keen Building is located at 77 Chieftan Way, Tallahassee, FL 32306.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents