Similar Projects
T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

The Other Place Office Development / Belton
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Belton, MO 64012

Recreation Park Trail Repairs
Infrastructure
Bidding
$354,000 CJ est. value
Raymore, MO 64083

Concrete Sidewalk Installation and Maintenance
Infrastructure
Bidding
$200,000 CJ est. value
Peculiar, MO 64078

FY 23 Street Preservation Project
Infrastructure
Post-Bid
Belton, MO

2022 Street Overlay, Curb Replacement, Storm Sewer Project
Infrastructure
Post-Bid
$220,000 est. value
Raymore, MO

Highway 58 Waterline Replacement
Infrastructure
Results
$313,900 CJ est. value
Raymore, MO 64083

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Harrisonville, Platte City, MO

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Good Parkway Improvements - 26-PRK-001 - City of Raymore
Infrastructure
Conception
$580,000 CJ est. value
Raymore, MO 64083

Prefabricated Metal Buildings
New Construction, Infrastructure
Bidding
$470,000 CJ est. value
Harrisonville, MO 64701

Backyard Channel Improvements
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Belton, MO 64012

Halsey to James Sanitary Sewer
Infrastructure
Results
$600,000 est. value
Harrisonville, MO

Last Updated 10/11/2023 03:02 AM
Project Title

Cass County Bridge Replacement

Physical Address View project details and contacts
City, State (County) Harrisonville, MO 64701   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes: Construction of a 90-foot single span prestressed concrete NU-girder bridge along a new alignment, approach roadway work, and any incidental work in accordance with the plans and specifications. The project is located on Groh Road, in Section 35, Township 45N, Range 33W, Cass County, Missouri, over Massey Creek. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the United States Department of Labor (Federal Wage Rate), or by the Missouri Department of Labor and Industrial Relations (State Wage Rate), whichever is higher. The Cass County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023, Second Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. Contractors and sub-contractors who sign a contract to work on public works projects shall provide a 10- Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A certified cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The Cass County Commission reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. The DBE Goal for this project is 6%. No 2nd tier subcontracting will be allowed on this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents