Similar Projects
Last Updated | 06/21/2023 02:01 PM |
Project Title | Emerald High School - Additions and Renovations |
Physical Address | View project details and contacts |
City, State (County) | Greenwood, SC 29646 (Greenwood County) |
Category(s) | Education, Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Athletic Facility, Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $8,071,000 [brand] Estimate |
Plans Available from | Plan Holders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope includes, but is not limited to the folloiwng: Construction of a new 1,200 SF entry, new stadium AND baseball press boxes, renovation of exterior hardscape package. Demolition, concrete, masonry, steel package (inc. stairs), casework, rough carpentry, roofing (standing seam & TPO), insulation (inc. spray foam), doors & hardware, glazing, finshes, specialties, new elevator, fire protection system, mechanical, plumbing, electrical, fire alarm, site work, fencing, pavement markings, and asphalt paving. *Give attention to the trade allowances *Davis Bacon wage rates are required Project Location: 150 Bypass 225, Greenwood, South Carolina 29646 The project scope also includes a new Football Stadium Pressbox and a new Baseball Pressbox. The 3 level stadium pressbox includes 2,320sf Ground Level storage area. The main Pressbox Level and and an observation roof deck. The pressbox consists of load bearing masonry, steel frame, aluminum operating windows, brick veneer, roof paver system, metal roofing canopy. Complete mechanical, plumbing, electrical, and audio visual systems. An elevator is also included in the project. The baseball pressbox is a 2 level 480sf pressbox. The construction consists of split face load bearing masonry, steel frame, aluminum operating windows, metal roof. Complete mechanical, electrical, and audio visual sstems. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |