Similar Projects
Alaris Medley Infusion Pumps
Post-Bid
Rockville, MD 20850

Well Services
Term Contract
Post-Bid
Annapolis, MD 21401

Chesapeake Heights and Dares Beach Well and Water Main Extension - Phase 2
Results
Prince Frederick, MD 20678

Pump & Valve Replacement for Allegany County Soldiers Memorial USARC in Cumberland, MD 21502
Results
Cumberland, MD 21502

Install Domestic Well (Office) at Manning Fish Hatchery
Post-Bid
Less than $100,000 est. value
Brandywine, MD 20613

Hickory Hills Water Tower and Well Project #8081WT and #8081WL
Results
$5,000,000 to $6,500,000 est. value
California, MD

Shafer Park Well Replacement
Post-Bid
Boonsboro, MD 21713

Repairs and Services to Hydraulic Pumps and Motors
Results
Glen Burnie, MD 21061

Rehabilitation of 2 Water Production wells
Post-Bid
Fruitland, MD

Fruitland Water System Upgrade - Supply Well and Water Treatment Plant
Results
Fruitland, MD 21826

Rehabilitation of 2 Water Production Wells
Results
Fruitland, MD 21826

Paleo Well Number 3 Construction
Results
Salisbury, MD 21802

Well Abandonment
Results
Frederick, MD 21701

Remove and Replace Domestic Water Booster Pump Systems
Results
Baltimore, MD 21201

Electric Motor/Pump Repair and Replacement for Swimming Pools
Term Contract
Results
Rockville, MD 20850

Reported 10/06/2020 12:00 AM
Project Title

By-Pass Pumping Services

Physical Address View project details and contacts
City, State (County) Laurel, MD 20707   (Prince Georges County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Sewer By-Pass Pumping, Temporary Water By-Pass, and Dewatering Services on an as needed basis for assets throughout Montgomery and Prince George’s Counties, Maryland. The Contractor is required to furnish all materials, labor, equipment, power, tools, maintenance, etc. to implement a temporary by-pass pumping system for the purpose of diverting or dewatering the existing flow around the work area as requested.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents