Similar Projects
Polk-Quincy - 701048.0 - City of Topeka
Infrastructure
Conception
$7,000,000 est. value
Topeka, KS

South Kansas Avenue(4th to 6th Avenue) - 841095 - City of Topeka
Alteration
Conception
$892,045 est. value
Topeka, KS 66630

BRVB - Pavement Resurfacing and ADA Improvements
Infrastructure
Design
$25,000 to $100,000 est. value
Topeka, KS 66612

Milling and HMA Overlay
Infrastructure
Bidding
$800,000 est. value
Hays, Topeka, KS 66614

Street Improvement Project
Infrastructure
Bidding
$5,000,000 est. value
Topeka, KS

14th Street Improvements
Infrastructure
Post-Bid
Auburn, KS

South Topeka Blvd BNSF Rail Crossing Removal & Pavement Replacement
Infrastructure
Post-Bid
Topeka, KS

Micro-Surfacing 2021
Infrastructure
Results
Topeka, KS

2021 City Wide Temporary Cap Replacement
Infrastructure, Alteration
Results
Topeka, KS

S. Topeka Blvd from 29th Street to 37th Street - 701038
Alteration
Conception
$2,343,290 est. value
Topeka, KS 66612

Repairs and Striping at the Detention Facilities
Infrastructure
Bidding
$60,000 est. value
KS

Fire Stations Paving Repairs
Infrastructure
Post-Bid
$200,000 est. value
Topeka, KS

City Street Repair
Infrastructure
Results
Topeka, KS

SW Fairlawn Road from 23rd Street to 29th Street - 701040
Infrastructure
Conception
$1,446,500 est. value
Topeka, KS

Street Improvement Project
Infrastructure
Bidding
$500,000 est. value
Topeka, KS 66604

Last Updated 07/13/2022 12:21 PM
Project Title

South Topeka Boulevard from 15th to 21st - 701045 - City of Topeka

Physical Address View project details and contacts
City, State (County) Topeka, KS 66630   (Shawnee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2024
Bids Due View project details and contacts
Estimated Value $4,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Topeka, Kansas. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Project design is scheduled for 2026 with minor utility relocations and easement acquisition (if needed) planned for 2027. Construction is scheduled to occur in 2028. Estimated cost for the improvements is $6.0M. There are ongoing issues in the outside lanes of this stretch of S. Topeka Blvd - specifically northbound approaching SW 17th. Additional project will include complete reconstruction of the intersection of 21st and Topeka in 2024 along wtih Watermain Replacemen This project is in included in the City of Topeka FY 2023-2032 Capital Improvement Plan (CIP). As of July 12, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents