Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Dave's Hot Chicken / Cathedral City
Demolition, New Construction, Infrastructure - 2,675 SF
Design
$800,000 CJ est. value
Cathedral City, CA 92234

Riverside Facility Asphalt Overlay Project
Infrastructure
Post-Bid
Riverside, CA 59968

ADA Improvement Project 31540-42 Railroad Canyon Road
Alteration
Post-Bid
Canyon Lake, CA 92587

2021 Citywide Slurry Seal Project
Infrastructure
Results
$3,200,000 est. value
Murrieta, CA 92562

52nd Avenue Resurfacing Monroe Street to Van Buren Street Project No. D0-0065 and Calhoun Street Reconstruction 54th Avenue to 0.12 Miles North of 52nd Avenue Project No. C9-0012
Infrastructure
Results
$1,390,000 to $1,620,000 est. value
Riverside, CA 92519

Hillcrest HS Portables
New Construction, Infrastructure
Construction
$587,000 CJ est. value
Riverside, CA 92503

Inland Valley Medical Center Patient Tower
New Construction, Infrastructure - 290,000 SF
Construction
$170,000,000 CJ est. value
Wildomar, CA 92595

Amanda Ave and Winchester Road Mixed-Use
New Construction, Infrastructure - 7,550 SF
Pending Verification
$3,300,000 CJ est. value
Riverside, CA 92522

Amanda Ave and Winchester Road Mixed-Use
New Construction, Infrastructure - 7,550 SF
Pending Verification
$3,300,000 CJ est. value
Riverside, CA 92522

Pueblo Cannabis
Renovation, Infrastructure - 3,400 SF
Design
$150,000 est. value
Coachella, CA 92236

Pavement Striping, Markings and Markers
Infrastructure
Post-Bid
Cathedral City, CA 92234

McCall Boulevard Resurfacing
Infrastructure
Results
Menifee, CA 92584

Wingsweep Parcels at Sommers Bend
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Temecula, CA 92590

Improvement of Bike Network Connectivity/ATP Trails
Infrastructure
Design
$7,220,000 est. value
Corona, CA 92880

Last Updated 11/04/2022 08:04 AM
Project Title

Rehabilitate Mainline Pavement, Shoulders and Ramps

Physical Address View project details and contacts
City, State (County) Riverside, CA 92506   (Riverside County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $191,557,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate Mainline Pavement, Shoulders and Ramps Project ID : 0816000090 Bkpm: 134.0 Ahpm : 156.5 Proposed Advertise Date : 11/03/2022 As of November 04, 2022, the project is in Final Planning status. Anticipated construction year is 2023. CADOT - Rehabilitate Mainline Pavement, Shoulders and Ramps *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents