Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Lynn Lane Trunk Sewer Replace - S.1609 - Construction
Infrastructure
Conception
$1,874,896 est. value
Broken Arrow, OK 74012

Shredding Services - Tulsa District Office
Term Contract
Design
Tulsa, OK 74137

I-44 - Utilities
Alteration
Design
$2,074,299 est. value
Tulsa, OK 74145

2" Waterline Replacement
Infrastructure
Bidding
Tulsa, OK

Woodstock Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$759,512 CJ est. value
Broken Arrow, OK 74012

Aggregate
Term Contract
Sub-Bidding
Broken Arrow, OK 74012

Asphalt
Term Contract
Sub-Bidding
Broken Arrow, OK 74012

P21-037 Plating Chemical Environment Preventative / Remedial Maintenance Service
Term Contract
Post-Bid

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

CDBG Water Line Replacement
Infrastructure
Results
Sand Springs, OK 74063

Replacement of Water Lines at Mohawk Water Treatment Plant(WTP)
Infrastructure
Results
$3,068,000 est. value
Tulsa, OK 74115

Haikey Creek Trunk Sewer Phase 1 - Construction - HC21010 - City of Broken Arrow
Infrastructure
Conception
$4,090,075 est. value
Broken Arrow, OK 74011

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Westwind Lift Station Conversion
New Construction, Infrastructure
Bidding
$150,000 CJ est. value
Broken Arrow, OK 74012

Last Updated 08/05/2022 02:05 PM
Project Title

UULS Underground Utility Locate Services

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74103   (Tulsa County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all tools, materials and labor and performing the work necessary to be done in the construction of the following: PROJECT NO. 2022-224 UULS UNDERGROUND UTILITY LOCATE SERVICES The entire cost of the improvement shall be paid from Account No. 2331W00014.WaterDist.Water.7400.74003122-541101 2331S00015.Sewerlines.Sewer.7500.75003122-541101 144309.Streets.ArtRhb.4270.42713122-541102 144021.Streets.5453104.6328.42703122-541106 Bids will be accepted by the City Clerk from the holder of valid prequalification certificates from the City of Tulsa in one or more of the following classifications: No PreQualification Drawings, specifications and contract documents for construction of said public improvements of the said project have been adopted by the Mayor of said City. Contract requirements shall include compliance as required by law pertaining to the practice of non-discrimination in employment. Attention is called to Resolution No. 18145 of August 23, 1988, requiring bidders to commit to the goal of employing on the project at least fifty percent bona fide residents of the City of Tulsa and/or MSA in each employment classification. Attention is called to Resolution 7404 of November 8, 2006, requiring bidders, their subcontractors and their lower-tier subcontractors to hire only citizens of the United States. The Authority, acting on behalf of the City of Tulsa, is exempt from the payment of any sales or use taxes, and pursuant to Title 68 O.S. Section 1356(10), direct vendors to the Authority are also exempt from those taxes. A bidder may exclude from his bid appropriate sales taxes which he will not have to pay while acting for and on behalf of the Tulsa Metropolitan Utility Authority. See Contract Article IIB. A Certified or Cashiers Check or Bidders Surety Bond, in the sum of 5% of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. The bidder to whom a contract is awarded will be required to furnish public liability and workmens compensation insurance; Performance, Statutory, and Maintenance bonds acceptable to the Authority, in conformity with the requirements of the proposed contract documents. The Performance, Statutory, and Maintenance bonds shall be for one hundred percent (100%) of the contract price.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents