Similar Projects
University Housing As Needed HVAC
Alteration
Bidding
Richardson, TX

5 Ton Wayside Units
Alteration
Bidding
Dallas, TX

HVAC Maintenance and Repair
Term Contract
Post-Bid
Mesquite, TX 75150

Air Handler Cleaning
Post-Bid
Dallas, TX 75235

65--Steam Sterilizers - Removal, Installation and Maintenance Sources Sought Notice
Results
Dallas, TX

Citywide Facilities Maintenance Services
Results
DeSoto, TX 75115

HVAC Maintenance and Related Services
Alteration
Bidding
Garland, TX 75040

HVACR Maintenance, Repairs and Minor Replacements
Post-Bid
Dallas, TX

Chiller Replacement at Various Campuses
Results
$2,576,523 est. value
Irving, TX 75061

HVAC Supply and Equipment
Term Contract
Bidding
Farmers Branch, TX

Boiler Maintenance and Repair Services
Post-Bid
Richardson, TX

AHU Replacement at Criminal Justice Center
Results
$586,352 est. value
Irving, TX 75060

Denton Creek Elementary School and Middle School North HVAC Replacements
Alteration
Bidding
Coppell, TX 75019

HVAC and Mechanical Products
Term Contract
Post-Bid

Refurbishing of AHU at City Hall
Results
$84,090 est. value
Irving, TX 75060

Last Updated 11/23/2021 12:44 PM
Project Title

DPS HQ - Building P - HVAC

Physical Address View project details and contacts
City, State (County) Garland, TX   (Dallas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all material and equipment for installation of one new roof mounted electric cooling/gas heating package unit which includes the following: 1. Contractor must provide all labor, materials and any needed rental equipment to remove and dispose of the existing roof top unit and curb. The existing unit is listed below: York Model DH180N24A2AAA2A Serial #NLMM122233 Rooftop Package Unit (RTU). 2. Contractor must provide an alternate price for inclusion of cleaning of supply and return duct attached to this unit, including supply and return grilles. See Section 23 01 30.41 – HVAC System Cleaning. 3. Contractor must provide and install: (1) One roof top 15 ton electric cooling/gas heating package unit as indicated in the Specification.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents