Similar Projects
Westover Air Facility Add Restroom and Outside Air Inspection Bay, Building 5305
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Chicopee, MA 01022

Renovate Bathrooms, 204 North Street
Renovation
Bidding
$90,000 CJ est. value
Norfolk, MA 02056

Cold-in-place Recycling of Bituminous Concrete Pavement
Term Contract
Sub-Bidding
Hopkinton, MA 01748

Supply and Delivery of Concrete Dock Floats
Term Contract
Sub-Bidding
Nantucket, MA 02554

Walsh Mezzanine - Boiler Room Slab
Alteration
Post-Bid
$40,000 est. value
Framingham, MA

Walkway Reconstruction
Infrastructure, Alteration
Post-Bid
Upton, MA

Orchard Street Water Storage Tank Rehabilitation Re-bid
Renovation
Results
$632,710 CJ est. value
Raynham, MA 02767

Primary Clarifier Concrete Restoration
Results
Less than $9,400,000 est. value
Salem, MA

Exterior Concrete Stair Reconstruction
Infrastructure, Renovation
Construction
$210,000 CJ est. value
Dracut, MA 01826

Seasonal Dormitory - Repairs and Painting - General Bid
Renovation
Bidding
$175,000 CJ est. value
Nantucket, MA 02554

Roadway Crack Sealing
Infrastructure
Sub-Bidding
$110,569 CJ est. value
Longmeadow, MA 01106

King Stairs - Concrete Repair
Alteration
Post-Bid
$65,000 est. value
Framingham, MA 01701

Bench Replacement, Woodland Meadows 667-1 and 667-2
Alteration
Results
$49,000 est. value
Norton, MA

Construction of New Elementary School - General
New Construction, Infrastructure - 88,495 SF
Bidding
$50,387,133 CJ est. value
Westfield, MA 01085

Toilet Rooms Renovation for Mary Curley 4-8 School - Phase 1B - Sub Bid
Renovation
Sub-Bidding
$300,000 CJ est. value
Boston, MA 02130

Last Updated 02/24/2023 02:12 PM
Project Title

Constructed on a 3.75-Acre Site on Which the Existing Keith Center (Composed of the Frederic Douglas Academy and the Champion High School)

Physical Address View project details and contacts
City, State (County) Brockton, MA 02301   (Plymouth County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $74,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Brockton Public Safety facility will be constructed on a 3.75-acre site on which the existing Keith Center (composed of the Frederic Douglas Academy and the Champion High School) is currently situated. The Keith Center will be demolished and removed, and a new 117,583 gross square foot facility will be constructed in its place, along with an adjacent parking structure for a total square footage for the Project of 226,265 SF. The proposed two- and three-story facility will include a new headquarters for the Fire, Police, I.T., Emergency Response Departments for Brockton. The Facility will consist of two wings a north wing that will house the Fire Department, and a south wing that will house the Police and Emergency Departments.

Details

117,583 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents