Similar Projects
Annual Chiller Maintenance Services
Term Contract
Post-Bid
$50,001 to $100,000 est. value
Farmington, NM 87402

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Gallup, NM 87305

Eva B. Stokely Elementary School HVAC Upgrades 2020
Results
Shiprock, NM 87420

Albuquerque Job Corps Center - Plumbing
Post-Bid

Zuni Service Unit York Chiller Preventative Maintenance Agreement
Results
Zuni, NM

Recommissioning/Test and Balance CDC HVAC
Post-Bid

Two (2) Cooling Towers for San Juan Regional Medical Center
Results
Aztec, NM 84535

HVAC MERV-13 Filters
Term Contract
Post-Bid
Gallup, NM

HVAC Replacement Reroof
Results
Zuni, NM

Cooling Tower Taco Pump/Motor Assembly Replacement
Post-Bid
Crownpoint, NM 87313

Kirtland Central High School Fieldhouse HVAC and Roof Upgrade 2021
Renovation, Alteration - 8,170 SF
Results
$925,000 est. value
Kirtland, NM 87417

HVAC System Upgrade for Campus Dorm
Post-Bid
Shiprock, NM

Maintenance Shop Exhaust System
Alteration
Results
Gallup, NM

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Reported 12/31/2021 12:00 AM
Project Title

Head Start HVAC Services - Shiprock and Crownpoint District

Physical Address View project details and contacts
City, State (County) Crownpoint, Shiprock, NM (McKinley, San Juan Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall be able to provide personnel who have been fully trained in all phases of HVAC, air vents and duct systems operation, maintenance, adjustment, and repair. Contractor’s personnel should also have familiarity with all types of components including controllers, electrical components, general preventative maintenance, repairs, and new installations of a variety of brands and models. The contractor and staff shall have expertise and experience in HVAC management to include the following but not limited to: Assessments and approvals needed for Head Start sites: 1. Complete an assessment on the condition of all HVAC units, air vents and ducts. 2. Upgrade and install HVAC units and the repair/replacement/cleaning of air vents and ducts that all applies to code and compliance standards, upon NHS approval. 3. Provide a scope of work and quote needed for all repairs. 4. Ensure a work order is provided by the Navajo Head Start Facility Support Service Coordinator before services are started. 5. All parts and supplies should be properly disposed in accordance with EPA regulations, upon approval of Navajo Head Start. Work: 6. Provide routine preventative HVAC maintenance services including air vents and duct services. 7. Major and minor repairs on the HVAC, air vents and duct systems. 8. Provide services when needed. 9. Provide new materials used on all HVAC, air vents and duct systems and shall be free of defects and pass inspection. 10. Provide labor, supplies, parts, and equipment for the HVAC, air vents and duct services. 11. Provide a schedule and detail of each location within the district of what needs repairs and upgrades. 12. Provide a timeline of when work is complete longer than 24 hours, dependent upon the supplies needed for the work. 13. Provide start up and inspections before start of services and after services have been completed. 14. Provide a sticker for HVAC system to verify service date. 15. Routine maintenance and repairs shall be done in accordance with federal and Navajo Nation regulations and codes. 16. Services to be performed and completed in accordance with industry acceptable standards. 17. Ensure work order is signed and returned to the Navajo Head Start Facility Support Service Coordinator. 18. Warranty Service: Extended warranty parts and labor (define maximum number of years available). 19. Dispose of all hazardous materials when repairs or changing any HVAC units. 20. Must comply with all Federal and Navajo Nation Regulations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents