Similar Projects
New Elementary School North - Williamson County School Board
New Construction
Conception
$29,000,000 CJ est. value
Franklin, TN 37064

New High School West/Northwest - Williamson County School Board
New Construction
Conception
$62,000,000 CJ est. value
Franklin, TN 37064

Split Log Middle School
New Construction - 102,292 SF
Design
$55,000,000 est. value
Brentwood, TN 37027

Brentwood Academy Future Phases
New Construction, Infrastructure - 53,288 SF
Design
$70,000,000 CJ est. value
Brentwood, TN 37027

RFP Construction Manager at Risk - Construction of WCS Innovations Hub
Renovation - 20,000 SF
Bidding
$500,000 CJ est. value
Franklin, TN 37064

RFP Construction Manager at Risk - Construction of WCS Innovations Hub
Renovation - 20,000 SF
Bidding
$500,000 CJ est. value
Franklin, TN 37064

Creekside Elementary School Waste Water Treatment Plant
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Franklin, TN 37064

Continuing Roof Maintenance and Repairs
Term Contract
Post-Bid
Franklin, TN 37064

Triune Area Elementary Wastewater Treatment and Disposal System
New Construction
Results
$2,500,000 est. value
Arrington, TN 37014

Brentwood Middle School Construction
New Construction - 217,648 SF
Results
$10,000,000 CJ est. value
Brentwood, TN 37027

New Elementary School South - Williamson County School Board
New Construction
Pending Verification
$29,000,000 CJ est. value
Franklin, TN 37064

Grassland Middle School Renovation - Williamson County School Board
Renovation
Pending Verification
$3,600,000 CJ est. value
Franklin, TN 37069

Page High School Phase IV Addition and Renovation
Addition, Renovation
Post-Bid
$3,789,000 CJ est. value
Franklin, TN 37064

Construction of the New Central East Elementary School
New Construction, Infrastructure - 121,089 SF
Results
$22,000,000 CJ est. value
Franklin, TN 37064

Hillsboro K-8 School Wastewater Treatment Plant Improvements
Renovation
Results
$2,389,000 CJ est. value
Franklin, TN 37064

Last Updated 01/03/2024 07:37 AM
Project Title

Casework Replacement at Fairview High School, Allendale, Clovercroft, Longview, Nolensville and Pearre Creek Elementary Schools

Physical Address View project details and contacts
City, State (County) Fairview, TN 37062   (Williamson County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Casework Replacement at FvHS, AES, CCES, LvES, NES and PCES Williamson County Schools, (WCS) is currently accepting sealed bids from qualified contractors for lab casework replacement at Fairview High School and classroom casework installations at various elementary schools (Allendale, Clovercroft, Longview, Nolensville and Pearre Creek). In the event WCS must reschedule a RFB opening date or time, the specifications obtained from the WCS Purchasing Dept. shall reflect the actual date and time. Once the sealed bid envelope is submitted to WCS, the Purchasing Department will stamp the face of the envelope to authenticate the actual date and time it is received. A. Fairview High School 1. Removal of existing laboratory casework in science classrooms. 2. Removal of existing asbestos containing vinyl composition tile flooring under laboratory casework at locations shown on drawings. 3. Installation of new vinyl composition tile flooring. 4. Installation of new laboratory casework and equipment. B. Allendale, Clovercroft, Longview, Nolensville and Pearre Creek Elementary Schools 1. Install new classroom casework as shown on drawings. Access to the work areas will not be allowed until Tuesday, May 30, 2023 All work is to be substantially complete on or before Friday, July 28 2023. Locations- Fairview High School - 2595 Fairview Blvd W, Fairview, TN 37062 Longview Elementary School - 2929 Commonwealth Dr, Spring Hill, TN 37174 Allendale Elementary School - 2100 Prescott Way, Spring Hill, TN 37174, Clovercroft Elementary School - 9336 Clovercroft Rd, Franklin, TN 37067 Pearre Creek Elementary School - 1811 Townsend Blvd, Franklin, TN 37064 Nolensville Elementary School - 2338 Rocky Fork Rd, Nolensville, TN 37135, Scope- remove and dispose of existing lab casework and equipment at locations shown on drawings as base bid condition, disconnecting all mechanical, plumbing, gas, and electrical fixtures. at space science lab fl 37, abate existing asbestos containing floor tile and mastic under removed casework. install new flooring, lab casework, equipment, and fixtures as shown on drawings for base bid conditions. install new sinks, plumbing, and gas fixtures at lab prep areas as show on drawings for base bid conditions. install new exhaust fans and ductwork at new fume hoods as shown on mechanical drawings. alt 1 Fairview High School - remove and dispose of existing student island workstations, disconnecting electrical receptacles and gas fixtures. install new student island workstations, reconnecting new fixtures to existing gas and electrical supply rough-in. alt 2 Fairview High School - remove and dispose of existing prep room casework, plumbing fixtures, and equipment, disconnecting all plumbing, gas, and electrical fixtures at prep room locations indicated on drawings as add alternate no. 2 scope of work. at spaces study fl 38 and storage fl 39, abate existing asbestos containing floor tile and mastic under removed casework. install new casework, equipment, and fixtures as shown on drawings for base bid conditions. install new flooring, casework, plumbing, and gas fixtures at lab prep areas as show on drawings for base bid conditions.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents