Similar Projects
Jackson Creek Road Improvements
Term Contract
Design

2022 Chip Seal
Infrastructure
Bidding
$155,000 est. value
Augusta, Lincoln, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Overlay and Chip Seal Girard West Miles City Area
Infrastructure
Post-Bid
Helena, MT

Hudson Bay Divide South
Infrastructure
Results

New Water and Sewer Main, Street Reconstruction
Infrastructure
Results
$619,326 est. value
East Helena, Helena, MT 59601

Overlay Denton East Lewistown Area
Infrastructure
Post-Bid
Helena, MT

East of East Helena - East Nh 8-2(99)53
Infrastructure
Results

Overlay Plentywood East Wolf Point Area
Infrastructure
Post-Bid
Helena, MT

Wolf Creek Area Fire Repairs
Infrastructure
Results
MT

Overlay and Chip Seal Lodgepole Road Kalispell Area
Alteration
Post-Bid

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Rodney Street-Phase 2
Infrastructure
Post-Bid
Helena, MT 59601

Six Miles North of Helena and includes Improvements to the Lincoln Road and North Montana Avenue Intersection
Infrastructure
Results
MT

2022 Chip and Seal Project
Infrastructure
Post-Bid
$111,000 est. value
Helena, MT

Reported 05/19/2022 12:00 AM
Project Title

Aberdeen Interchange West and Hospital Road Crow Agency Overlay and Chip Seal

Physical Address View project details and contacts
City, State (County) Helena, MT   (Lewis and Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 1,750 tons of 3/4 " Commercial Plant Mix Grade S PG 64-28asphalt mix material. The overlay shall be paved 0.15 feet thick and approximately 24 feet wide. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 15,850 square yards of laid-in-place chip seal. The chip seal will be approximately 1.067 miles long and 24 feet wide. Contractor shall provide CRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. The emulsion application rate for chip seals is estimated at 0.42 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. The Department will provide final striping. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents