Similar Projects
Resurface - IS040
Infrastructure
Conception
$7,587,470 CJ est. value
Anadarko, OK 73005

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Intersect Modif
Infrastructure
Design
$2,600,000 CJ est. value
Binger, OK 73009

Loves Lift Station and Force Main Improvements
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Hinton, OK 73047

Sugar Creek Hotel - Bid Package #1
New Construction, Infrastructure - 64,000 SF
Sub-Bidding
$15,000,000 CJ est. value
Hinton, OK 73047

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Stephenson-Taylor Water Line Extension
Infrastructure
Post-Bid
$250,000 CJ est. value
Binger, OK 73009

Waterline Relocation along SH-8
Term Contract
Results
Carnegie, OK

Resurface, Bridge Rehabilitation, and Cable Barrier I-40
Infrastructure
Results
$12,998,630 CJ est. value
Hydro, OK 73048

SH 09 - Utilities
Infrastructure
Design
$508,453 CJ est. value
Anadarko, OK 73005

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Waterline Replacement
Infrastructure
Results
$933,848 CJ est. value
Fort Cobb, OK 73038

Utilities - SH 58
Infrastructure
Design
$600,000 CJ est. value
Carnegie, OK 73015

Old Caddo County Maintenance Yard UST Removal
Infrastructure
Post-Bid
$166,170 CJ est. value
Anadarko, OK 73005

Pedestrian Improvements (Sidewalks) - US-62
Infrastructure
Results
$554,793 CJ est. value
Anadarko, OK 73005

Last Updated 07/07/2023 08:11 AM
Project Title

SH 08 - Utilities

Physical Address View project details and contacts
City, State (County) Cyril, OK 73029   (Caddo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2025 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,376,591 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-8: From Jct Sh-19/us-277 in Cyril, Extend West and North Approx 5.0 Mis Ut for 27072(0 As of July 07, 2023, the project is in design status. Anticipated letting month/year is November, 2024. Length :5.000 Mi OKDOT - SH 08 - Utilities *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents