Similar Projects
Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Design
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Upgrade Mechanical Systems
Bidding
Less than $250,000 est. value
River Grove, IL 60171

MVCC Building H Natatorium RTU Replacement
Bidding
Tinley Park, IL

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Boiler Tune-up at Various Locations
Post-Bid
Arlington Heights, Des Plaines, Evanston, Ford Heights, Franklin Park, Niles, Park Forest, Robbins, Wheeling, IL 60016

HVAC Equipment Replacement
Results
Evanston, IL 60201

2020 HVAC Replacement
Results
Wheeling, IL 60090

HVAC Upgrades
Renovation
Bidding
Chicago, IL 60605

HVAC Maintenance
Term Contract
Post-Bid
Mount Prospect, IL 60056

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

Des Plaines HVAC Improvements
Bidding
Des Plaines, IL

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

Heating Small Construction Repairs in the Emergency Heating Repair Program - JOC
Term Contract
Post-Bid
Less than $1,800,000 est. value
Chicago, IL 60602

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Last Updated 10/28/2020 01:32 PM
Project Title

Filtration at Grover Cleveland Elementary School

Physical Address View project details and contacts
City, State (County) Chicago, IL 60618   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide supervision equipment materials and skilled labor to perform the following work: Measure and order new filter rack banks, Install pleated filters complete with 2 stainless steel clips per filter, Install hinge door and hold back screens if required for mechanical access, Install new differential pressure gauge for measuring filter conditions, Install any block off panels required to fasten frame assembly to adjacent walls of fan housing, Design and fabricate galvanized steel framework and necessary block off panels, Provide all necessary hardware to fasten frame to concrete and steel wall if required, Remove any old hardware not required to support new frame assembly, Leave area clean and orderly, Contractor to secure necessary permits, Contractor to field verify dimensions and specifics of all before placing bid, Not responsible for contractor errors as a result of non-field verification, Material and instillation must comply with cps standards and specifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents