Similar Projects
Stono Shores Subdivision
New Construction, Infrastructure
Conception
$5,000,000 est. value
Charleston, SC 29412

Grace Episcopal Church Parish Hall
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Charleston, SC 29401

RFQ Contractor - Construct Forward Area Refueling Point (FARP) B685
New Construction, Infrastructure - 3,376 SF
Design
$5,000,000 CJ est. value
Charleston, SC 29404

FLETC Training Venue Replication
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
North Charleston, SC 29405

FLETC Training Venue Replication
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
North Charleston, SC 29405

Road Work - SC41 Corridor Interim Improvement TST
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Charleston, SC 29466

Road Work - SC41 Corridor Interim Improvement TST
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Charleston, SC 29466

Single Family Home
New Construction - 1,044 SF
Post-Bid
Less than $500,000 CJ est. value
Charleston, SC 29401

Construction Repair Services
New Construction
Post-Bid
Charleston, SC 29403

Full Depth Patching-District 6
Results

Rehabilitation- Charleston Co
Results
SC

Public Storage
New Construction, Demolition - 44,919 SF
Construction
Charleston, SC 29414

Cooper Street Multi Residential
Demolition, New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Charleston, SC 29403

Harris Teeter / Kiawah Island
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Kiawah Island, SC 29455

Stonoview 4 Recreation & Boat Parking
Renovation, Alteration
Design
$300,000 est. value
Charleston, SC 29455

Last Updated 07/28/2022 11:14 AM
Project Title

Wooddale Subdivision

Physical Address View project details and contacts
City, State (County) Johns Island, SC 29455   (Charleston County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $172,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope includes, but is not limited to site work, road building and new construction of a 430-unit residential development. Phase I to include 71.52 acres with lots ranging from 6,500 square feet to 9,338 square feet. As of July 28, 2022, plat and road plans have been submitted for approval. Meeting is scheduled for August 11, 2022. Owner will be acting as General Contractor. Information regarding subcontractor bidding opportunities has not been released. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 430 Unit(s). Disturbed Acre, 71 Acre.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents