Similar Projects
Air Compressor for City of Taylor DPW
Term Contract
Sub-Bidding
Taylor, MI 48180

Demolition of 5108 Eugene
Term Contract, Demolition, Infrastructure
Sub-Bidding
$14,900 CJ est. value
Dearborn, MI 48126

Lead Abatement / Minor Repair Services
Term Contract
Post-Bid
Detroit, MI 48226

Port Street Vactor Pad and Grading/Plymouth Twp Pond
Infrastructure
Post-Bid
$400,000 CJ est. value
Plymouth, MI 48170

Asbestos Abatement at Cooper Upper Elementary School
Alteration
Results
$150,000 est. value
Westland, MI 48185

MSP Northville Forensic Lab Shooting Range - Lead Abatment
Alteration
Results
$40,000 est. value
Northville, MI 48167

Retention Treatment Basin (RTB) Effluent Channel Flap Gate Project
Demolition, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Wyandotte, MI 48192

Asbestos Abatement
Alteration
Post-Bid
$80,000 est. value
Detroit, MI 48234

House Demolition - 41321 Llewelyn Drive
Demolition, Infrastructure - 4,841 SF
Results
$65,250 CJ est. value
Northville, MI 48167

Demolition of Residential Structures Contractor
Demolition, Infrastructure
Sub-Bidding
$35,000 CJ est. value
Lincoln Park, MI 48146

Abatement and Demolition of Commercial Structures
Demolition, Infrastructure
Post-Bid
$20,000 est. value
Detroit, MI 48204

Detroit Land Bank Authority Renovation Project Manual
Renovation
Results
$1,800 CJ est. value
Detroit, MI 48214

Statewide Abatement and Remediation Services- Asbestos, Lead, and Mold
Alteration
Post-Bid

Dangerous Building Demolitions
Demolition, Infrastructure
Results
$65,900 CJ est. value
Ecorse, MI 48229

RFQ Contractor - Proposal N for Neighborhoods - Demolition
Demolition, Infrastructure
Post-Bid
$40,000 CJ est. value
Detroit, MI 48226

Last Updated 10/10/2023 08:32 AM
Project Title

Asbestos Abatement Haigh Elementary

Physical Address View project details and contacts
City, State (County) Dearborn, MI 48128   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000330822 Questions regarding bids can be emailed to Mr. Mark Andrews, Dearborn Public Schools. Asbestos Abatement at Haigh Elementary School Asbestos abatement work will be performed at Haigh Elementary School located at 601 Silvery Lane, Dearborn, Michigan 48128, The project consists of the ceilings demolition and removal of asbestos containing Glue Pods under 12"xl2" Ceiling tiles located throughout the school building ceiling (hallways, classrooms, and cafeteria) located on the main floor ofHaigh elementary school. In addition a removal of 400 linear feet ofpipe insulation throughout the school tunnel, boiler restroom and fan room. The school ceilings areas to be removed are approximately 18,476 square feet. The abatement operations dates and areas to be removed are listed below and as provided in the attached drawing; Location Start Date Finish Date Cafeteria Hallway North & West Hallway 12/22/2023 01/03/2024 Classrooms Ceilings 06/08/2024 06/13/2024 (27, 29,31,33,34,35,36) Cafeteria Ceiling & 06/14/2024 06/20/2024 Classrooms Ceilings Cafeteria Ceiling Hallway Ceiling 10/27/23 10/28/23 Remove 2' along exterior wall Remove 2' along interior hallway wall (26, 28, 30, 32) Miscellaneous Spot Remove (400) linear feet of pipe insulation in tunnel and complete removal in the school boiler restroom and fan room. The contractor must follow procedures for removal operations stated in Section L of this specification, part 5 through 9. The removal operations will be performed inside a Mini while Full enclosure procedures for cafeteria & west, north hallways and under continuous negative air. The abatement contractor must construct a decontamination facility attached to the enclosure which will house the clean room, shower room and dirty room. The asbestos abatement operations will be considered complete when visual inspection is passed and the test results for the final air clearance samples (PCM) indicated an airborne fiber concentration value of less than < 0.01 (f/cc) Fibers per Cubic Centimeter as recommended by the EPA. With the exceptions of Cafeteria hallway, north & west hallways, a TEM final air clearance will be conducted. The Owner will pay for the initial Transmission Electron Microscopy (TEM) final air clearance costs. However, if the regulated area does not pass the first clearance attempt, the abatement contractor will pay all remaining air monitoring and clearance costs including but not limited to testing time, laboratory analysis (TEM), shipping & handling and project related expenses, until the project is cleared per EPA regulations.

Details

18,476 SF.
Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents