Last Updated | 10/10/2023 08:32 AM |
Project Title | Asbestos Abatement Haigh Elementary |
Physical Address | View project details and contacts |
City, State (County) | Dearborn, MI 48128 (Wayne County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000330822 Questions regarding bids can be emailed to Mr. Mark Andrews, Dearborn Public Schools. Asbestos Abatement at Haigh Elementary School Asbestos abatement work will be performed at Haigh Elementary School located at 601 Silvery Lane, Dearborn, Michigan 48128, The project consists of the ceilings demolition and removal of asbestos containing Glue Pods under 12"xl2" Ceiling tiles located throughout the school building ceiling (hallways, classrooms, and cafeteria) located on the main floor ofHaigh elementary school. In addition a removal of 400 linear feet ofpipe insulation throughout the school tunnel, boiler restroom and fan room. The school ceilings areas to be removed are approximately 18,476 square feet. The abatement operations dates and areas to be removed are listed below and as provided in the attached drawing; Location Start Date Finish Date Cafeteria Hallway North & West Hallway 12/22/2023 01/03/2024 Classrooms Ceilings 06/08/2024 06/13/2024 (27, 29,31,33,34,35,36) Cafeteria Ceiling & 06/14/2024 06/20/2024 Classrooms Ceilings Cafeteria Ceiling Hallway Ceiling 10/27/23 10/28/23 Remove 2' along exterior wall Remove 2' along interior hallway wall (26, 28, 30, 32) Miscellaneous Spot Remove (400) linear feet of pipe insulation in tunnel and complete removal in the school boiler restroom and fan room. The contractor must follow procedures for removal operations stated in Section L of this specification, part 5 through 9. The removal operations will be performed inside a Mini while Full enclosure procedures for cafeteria & west, north hallways and under continuous negative air. The abatement contractor must construct a decontamination facility attached to the enclosure which will house the clean room, shower room and dirty room. The asbestos abatement operations will be considered complete when visual inspection is passed and the test results for the final air clearance samples (PCM) indicated an airborne fiber concentration value of less than < 0.01 (f/cc) Fibers per Cubic Centimeter as recommended by the EPA. With the exceptions of Cafeteria hallway, north & west hallways, a TEM final air clearance will be conducted. The Owner will pay for the initial Transmission Electron Microscopy (TEM) final air clearance costs. However, if the regulated area does not pass the first clearance attempt, the abatement contractor will pay all remaining air monitoring and clearance costs including but not limited to testing time, laboratory analysis (TEM), shipping & handling and project related expenses, until the project is cleared per EPA regulations. |
||||
Details | 18,476 SF.
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |