Similar Projects
East Fountain Apartments
New Construction - 82,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Colorado Springs, CO 80916

Percheron Master Plan
New Construction
Conception
Colorado Springs, CO 80902

Luxury Apartments
New Construction
Design
Colorado Springs, CO 80903

O`Neil Apartment Tower
New Construction - 147,900 SF
Design
$10,000,000 CJ est. value
Colorado Springs, CO 80903

Lofts at 1609
New Construction, Infrastructure - 162,607 SF
Post-Bid
$38,000,000 CJ est. value
Colorado Springs, CO 80910

Fox Bridge on Union
New Construction, Infrastructure - 249,286 SF
Post-Bid
$40,000,000 CJ est. value
Colorado Springs, CO 80920

Lodge at Black Forest Phase ll
New Construction - 375,358 SF
Construction
$10,000,000 est. value
Colorado Springs, CO 80908

The Zeb Apartments
New Construction - 200,000 SF
Construction
$46,000,000 est. value
Colorado Springs, CO 80920

Apartments
New Construction
Pending Verification
Colorado Springs, CO 80903

College Creek Apartments
New Construction
Pending Verification
Colorado Springs, CO 80908

Copper Rose Apartments
New Construction - 6,114 SF
Conception
$500,000 to $1,000,000 CJ est. value
Colorado Springs, CO 80902

Artspace COS Lofts
New Construction, Renovation - 56,046 SF
Design
$26,000,000 est. value
Colorado Springs, CO 80903

Draper Commons Project
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Colorado Springs, CO 80903

Ridgeline
New Construction - 283,000 SF
Construction
Colorado Springs, CO 80908

Narrate Apartments
New Construction - 27,740 SF
Pending Verification
Colorado Springs, CO 80903

Last Updated 12/30/2022 11:01 AM
Project Title

Hunt School Multi Family

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation
Project Status Seeking Funding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 2022, the property has been purchased and the owner is fundraising. Architect and General Contractor selection is unknown. Construction start is expected by Spring 2024.*

Details

Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents