Similar Projects
Southern Boulevard Industrial Center
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
West Palm Beach, FL 33411

Marine Way Seawall and Promenade Construction - 17-047 - City of Delray Beach
Infrastructure
Conception
$9,300,000 est. value
Gulf Stream, FL 33483

Tuttle Royale
New Construction, Infrastructure
Design
$279,600,000 CJ est. value
Royal Palm Beach, FL 33411

AutoZone #5999 / Wellington
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Village of Wellington, FL 33414

CVS #7891 Parking Lot ADA Improvements / Lake Worth - Rebid
Infrastructure
Post-Bid
$100,000 CJ est. value
Lake Worth, FL 33467

Vehicle Service Road Relocation
Post-Bid
$500,000 est. value
Palm Beach, FL

Central Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir Project
Results
$100,000,000 to $250,000,000 est. value
Palm Beach, FL

Original Section Drainage Improvements Phase 7
Results
$250,000 est. value
Greenacres, FL 33463

Home Depot Site Work at Alton
New Construction
Construction
Palm Beach Gardens, FL 33418

RFP Construction Manager at Risk - Sunset Palms Middle School 17- PP New Construction
New Construction, Infrastructure
Construction
$56,000,000 CJ est. value
Boynton Beach, FL 33472

Villages of Windsor
New Construction, Infrastructure
Pending Verification
$71,000,000 CJ est. value
Boynton Beach, FL 33426

PopStroke Golf Facility - Delray Beach
New Construction, Infrastructure - 4,500 SF
Pending Verification
$1,760,000 CJ est. value
Delray Beach, FL 33483

Palm Beach International Airport - Turnage Boulevard Rehabilitation - Palm Beach County
Infrastructure
Conception
$8,907,000 CJ est. value
West Palm Beach, FL 33415

The Bexly At Boutwell Apartments
New Construction, Infrastructure - 194,977 SF
Design
$80,000,000 CJ est. value
Lake Worth, FL 33461

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Last Updated 10/07/2022 07:37 AM
Project Title

Central Everglades Planning Project (CEPP) Contract 11A, EAA A-2 Reservoir Foundation and Cutoff Wall

Physical Address View project details and contacts
City, State (County) Belle Glade, FL 33430   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $492,335,680 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 28, 2022 Contract Award Number: W912EP22C0017 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: FORGEN-ODIN JV Contractor Awarded Address: Rocklin, CA 95677 USA Base and All Options Value (Total Contract Value): $492335680.00 Central Everglades Planning Project (CEPP) Contract 11A, Everglades Agricultural Area (EAA) A-2 Reservoir Foundation & Cutoff Wall Project, Palm Beach County, Florida. DESCRIPTION OF WORK: REFER TO SECTION 01 11 00 FOR COMPLETE PROJECT DESCRIPTION. DRAWINGS: SEE DFARS CLAUSE 252.236-7001, IN SECTION 00100. MAGNITUDE OF CONSTRUCTION IS BETWEEN $250,000,000 and $500,000,000. THIS IS AN UNRESTRICTED SOLICITATION AND ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. THE NAICS CODE IS 237990 AND THE SMALL BUSINESS SIZE STANDARD IS $39,500,000.00. OFFERORS ARE NOTIFIED THAT REAL ESTATE IS NOT CURRENTLY CLEARED FOR CONSTRUCTION BUT WILL BE BY ISSUANCE OF THE FULL NOTICE TO PROCEED. ***BLOCK 11 - SEE SECTION 00700, CLAUSE 52.211-10 FOR PERIOD OF PERFORMANCE. A SITE VISIT WILL BE HELD SEE FAR CLAUSE 52.236-27 IN SECTION 00100. YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM THIS SOLICITATION. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 30 June 2022, 5:00 P.M. Local Time. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team. The Solicitation Number is: W912EP22R0005 The Bidder Inquiry Key is: DP9TJP-SGQGF7 The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11A, Everglades Agricultural Area (EAA) A-2 Reservoir Foundation & Cutoff Wall Project, Palm Beach County, Florida. Preproposal Conference A Pre-Proposal Conference will be held on Wednesday, 22 June 2022 from 10:00am - 11:00am, EST via teleconference. The call-in number is: 1-844-800-2712 and the ACCESS CODE is: 199 227 9920## * It is requested that an email be sent to martha.g.sequeira@usace.army.mil to confirm attendance by your organization. Scope of Work The Scope of Work for this project includes the following features: Clearing, grubbing, de-mucking, blasting, foundation preparation, installation of a seepage cutoff wall, canal backfilling, and all incidental related work to prepare approximately 15.3 miles of foundation for a 17.3 miles-long embankment dam, to be constructed under separate contract within the Everglades Agricultural Area (EAA). The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Dewatering will be required to control the groundwater and conduct work in the dry in accordance with contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and provided to the USACE for construction of these project features. ESTIMATED MAGNITUDE OF CONSTRUCTION: $250,000,000 and $500,000,000 ESTIMATED PERIOD OF PERFORMANCE: 2,044 calendar days NAICS: 237990 SIZESTANDARD: $39,500,000 PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the government utilizing best value source selection procedures. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents