Similar Projects
SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

High Point Neighborhood Park West
Post-Bid
Denver, CO

2019 Bayfield Culvert Repair
Results
$200,000 to $300,000 est. value
Bayfield, CO 81122

Embankment Material
Results
CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

Installs Soldier Piles and Reinforced Facing Along A Cantilevered Concrete Retaining Wall That Was Undermined From North Clearcreek Scour
Results
Less than $1,000,000 est. value
CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Detention Pond Improvements
Post-Bid
Golden, CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Last Updated 07/24/2020 02:50 AM
Project Title

US 24, M.P. 288.74, will Clean Culvert and Box Culvert and Repair Joint between the Cmp and Cbc, and Will Add Turf Reinforcement Mat and Rock Check Dams Near Inlet to Help Prevent Erosion

Physical Address View project details and contacts
City, State (County) CO   (Pueblo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is a scour countermeasure project under CDOT structures: K-18-BY & K-18-BZ on US50B at MP 318 on the east side of Pueblo, Colorado. Project work will consist of repairing existing scour with fill material and constructing a scour preventative grouted boulder drop structure. Please contact CDOT Project Engineer, Steve Spera at (719) 251-7816 with questions. Major Items 201-00000 Clearing and Grubbing 1.000 L S 206-00065 Structure Backfill (Flow-Fill) 57.000 CY 206-01750 Shoring 1.000 L S 208-00400 Water Control 1.000 L S 212-00006 Seeding (Native) 0.190 ACRE 304-06007 Aggregate Base Course (Class 6) 21.000 CY 403-34721 Hot Mix Asphalt (Grading SX) (75) (PG 58-28) 13.900 TON 411-10255 Emulsified Asphalt (Slow-Setting) 9.000 GAL 601-01010 Concrete Class BZ 103.000 CY 603-00078 Culvert Lining (78 Inch) 120.000 LF 624-23049 48 Inch Drainage Pipe (Class 3) (Complete In Place) 153.000 LF 625-00000 Construction Surveying 1.000 L S 626-00000 Mobilization 1.000 L S 627-00005 Epoxy Pavement Marking 2.000 GAL 630-00000 Flagging 200.000 HOUR 630-00012 Traffic Control Management 38.000 DAY 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Temporary) 2.000 EACH 630-86810 Traffic Signal (Temporary) 2.000 EACH 632-00000 Night Work Lighting 1.000 L S

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents