Similar Projects
AA Storage/ Beaufort
New Construction, Infrastructure - 150,567 SF
Conception
$16,000,000 CJ est. value
Beaufort, NC 28516

Dog park at McLean-Spell Park - City of Emerald Isle
Infrastructure
Design
$52,000 CJ est. value
Emerald Isle, NC 28594

Showboat Redevelopment
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Atlantic Beach, NC 28512

Dock Repairs
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Morehead City, NC 28557

Hardstand Area Expansion - Area G
Infrastructure
Bidding
$1,540,000 CJ est. value
Morehead City, NC 28557

East Double Tree Beach Access
Infrastructure
Post-Bid
Atlantic Beach, NC

Pine Knoll Shores Aquarium - Boardwalk / Deck Renovations
Infrastructure
Post-Bid
$625,000 CJ est. value
Pine Knoll Shores, NC 28512

Labor for Draw Bridge Operation Over the Straits- Harkers Island and the Trent River-new Bern
Infrastructure
Results
$307,120 CJ est. value
South River, NC 28516

Carteret County Schools - Addition to Carteret Preschool Center
Addition, Infrastructure - 3,041 SF
Results
$863,000 CJ est. value
Newport, NC 28570

Ridge Care Senior Living
New Construction, Infrastructure - 85,000 SF
Pending Verification
$22,700,000 CJ est. value
Morehead City, NC 28557

Liberty Commons of Carteret County
New Construction, Infrastructure
Pending Verification
$23,145,199 CJ est. value
Newport, NC 28570

Berth 4 and 5 Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Morehead City, NC 28557

Hangar 75 Site Work
Infrastructure
Results
$344,685 CJ est. value
Beaufort, NC 28516

West Terminal Boulevard Quadraplex Phase II
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Atlantic Beach, NC 28512

RFQ - Stormwater Management Master Plan
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Emerald Isle, NC 28594

Last Updated 01/25/2023 12:38 PM
Project Title

Compass Hotel / Beaufort

Physical Address View project details and contacts
City, State (County) Beaufort, NC 28516   (Carteret County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $27,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a 101 room hotel at 103, 113, 115 & 208 Cedar Street and 319 Orange Street. As of January 25, 2023, this project is in the early planning stages. An architect has been selected. Information regarding a general contractor has not been provided. A firm construction timeline has not yet been established, however, it is expected to open in 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents