Similar Projects
Replacement of the Pumps, Piping, Back-up and Electrical Controls of the Pump Station
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Benton, IL 62812

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Reseal
Infrastructure
Post-Bid
Christopher, IL

6 Miles of Pcc Pavement, Milling, Surfacing, Hma Shoulders, Aggregate Shoulders and Patching on Il 148 from One Mile South of Il 154 to Il 14
Results
IL

Resurface South Thompsonville Road from IL 34 to the Williamson County Line
Infrastructure
Results
IL

Reseal
Infrastructure
Post-Bid
Benton, IL

Reclamation
Infrastructure
Results
Benton, IL

Roadway Paving
Infrastructure
Post-Bid
Benton, IL

New Pavilions
New Construction
Results
Less than $200,000 est. value
West Frankfort, IL

Construction of Water System Improvements - Phase II
Infrastructure
Post-Bid
$300,000 CJ est. value
Sesser, IL 62884

9 Miles of Lane Addition, Median Barrier Installation and Resurfacing Existing Lanes of I-57 From Mile Post 66 to Marcum Branch
Infrastructure
Results
IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Road Improvements
Infrastructure
Results
West Frankfort, IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Last Updated 09/13/2022 03:36 AM
Project Title

Patching, Milling and Resurfacing on I-57

Physical Address View project details and contacts
City, State (County) Benton, IL 62812   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,169,133 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Patching, milling and resurfacing on I-57 from 1.5 miles south of IL 154 to 1.25 miles north of the Campground Road overpass bridge. Region 5 District 9 Federal Project # N/A County(s) Franklin, Jefferson Key Route(s) FAI 57 Marked Route(s) I-57 Section(s) D9 PATCH 2022-11 State Job #(s) C-99-069-22 PPS #(s) 9-00147-2130 VBP %:0.00 Questions not accepted as of July 26, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, June 24, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 037 - Patching, Milling and Resurfacing on I-57

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents