Similar Projects
Neuragenex Tenant Build Out/ Commercial Renovation
Renovation - 5,300 SF
Bidding
$1,200,000 CJ est. value
Rowlett, TX 75088

Addison Municipal Airport Taxiway Bravo Extension Phase 1
Infrastructure
Bidding
$6,330,835 CJ est. value
Addison, TX 75001

Annual Requirements Contract for Ready Mix Concrete
Term Contract
Post-Bid
Richardson, TX 75081

Rebar and Concrete Steel Supplies
Term Contract
Post-Bid
Grand Prairie, TX 75050

Street Repairs for Big Town Blvd
Infrastructure
Results
$1,210,384 CJ est. value
Mesquite, TX 75149

Annual Contract for Concrete Sidewalk, Curb, Gutter, and Utility Cut Repair and Maintenance
Term Contract
Post-Bid
Rowlett, TX 75088

Irrigation Repairs and Controller Replacement
Infrastructure
Post-Bid
$5,000 CJ est. value
Dallas, TX 75212

2022 Arterial Term Concrete Repair Contract
Term Contract
Post-Bid
$3,000,000 CJ est. value
Garland, TX 75040

Concrete
Term Contract
Post-Bid
Dallas, TX 75201

2023 Sidewalk Repair Program
Infrastructure
Post-Bid
$900,000 CJ est. value
Highland Park, TX 75205

Rowlett Alley Reconstruction: Eagle Drive, Linda Vista Court and Eagle Drive, Teal Court, Allen Lane
Infrastructure
Post-Bid
$1,757,232 CJ est. value
Rowlett, TX 75088

Mountain Creek Lake Bridge Restriping
Infrastructure
Post-Bid
$130,000 CJ est. value
Dallas, TX 75201

Eddie Bernice Johnson Union Station Elevator Repair and Upgrade
Renovation
Post-Bid
$310,000 CJ est. value
Dallas, TX 75202

Annual Supply of Concrete
Term Contract
Post-Bid
Mesquite, TX 75149

2022 Annual Concrete Contract
Term Contract
Post-Bid
Garland, TX 75040

Last Updated 08/21/2023 02:07 AM
Project Title

RFP -UNTHSC CCAP 2022 Gibson Library 2nd, 3rd, 4th Floor Renovation & Met 4th Floor Renovation

Physical Address View project details and contacts
City, State (County) Dallas, TX 75201   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Request for Proposals (RFPs), Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $9,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The LIB project will be a renovation of floors 2, 3, and 4 of the Gibson D. Lewis Library of approximately 23,000GSF (gross square feet). This is a facility that is available to students 24/7 and will remain open and occupied during construction. The facility has worn and/or dated finishes throughout (with the exception of the recently renovated 1st floor and a small portion for the 4th floor). Renovation will include new finishes, flooring, evaluation of the stairs for conformance to the International Building Code (IBC), assessment of space utilization concerns, and furnishings. Substantial completion anticipated to be December 2024. The MET 4th Floor Renovation project will convert existing space into the new Nursing School Dean's Suite consisting of private offices, hybrid classroom space, breakroom, open spaces, and conference/huddle rooms. Substantial completion anticipated to be June 2024. Questions concerning this proposal should only be directed to: Elaine Robbins - Construction Contract Coordinator II elaine.robbins@untsystem.edu. All questions must be received no later than 2:00p.m. CDT on August 8, 2023. All questions and answers will be posted to the website by 5:00p.m. CDT on August 10, 2023. The Contractor shall provide and maintain insurance, performance bond, and payment bond has required, the minimum insurance coverage and bonding requirements are stated in Division 00, Section 007000, UNTS Uniform General Conditions. The prevailing wage schedule is not a representation that qualified labor adequate to perform the Work is available locally at the prevailing wage rates. When requested, Contractor shall furnish competent evidence of compliance with the Texas Prevailing Wage Law and the addresses of all workers. Damages will be assessed at $1000.00 per day, past substantial completion date. Liquidated Damages will be assessed on a per project basis. The Owner reserves the right to: (a) enter into agreements or other contractual arrangements for all or any portion of the Scope of Work set forth in this Proposal with one or more respondents; (b) reject any and all offers and re-solicit offers; or (c) reject any and all offers and temporarily or permanently abandon this procurement, if deemed to be in the best interest of the Owner. construction cost of $9,500,000.00. HUB goal of 28% for building construction

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents