Similar Projects
HVAC Maintenance Services Re-bid
Term Contract
Sub-Bidding
Columbia, SC 29201

Chiller Equipment Maintenance
Term Contract
Sub-Bidding
Columbia, SC 29201

C.Lem Harper Building - Auditorium HVAC Unit Renovation
Alteration
Post-Bid
$100,000 to $200,000 est. value
Columbia, SC 29201

17.5 Ton HVAC Unit
Alteration
Post-Bid
Columbia, SC 29210

Bryan/Morris Village Cooling Tower Piping Replacement
Results
$1,300,000 to $1,500,000 est. value
Columbia, SC 29203

Hayne Lab - Install HVAC Rooms 112 and 208
Alteration
Results
$25,000 to $35,000 est. value
Columbia, SC 29223

Automotive HVAC Unit Replacement
Alteration
Post-Bid
$85,000 to $100,000 est. value
Columbia, SC 29205

North Tower Projects - Replace Air Handlers and (Energy Facility) Control System Upgrades
Alteration
Results
Columbia, SC 29201

ACA HVAC
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Eastover, SC 29044

USC Thomson Student Health Center Air Handler Unit Replacement
Alteration
Results
$175,000 to $200,000 est. value
Columbia, SC 29208

Warehouse Ventilation System
Alteration
Post-Bid
$10,000 to $30,000 est. value
Columbia, SC 29210

Roof Top HVAC Maintenance for SCDPS
Term Contract
Results
Columbia, SC 29212

Provide Liebert DS070WD of Equivalent Computer Room Air Conditioners
Alteration
Post-Bid
Columbia, SC

Blatt Building, Replace Hot/Cold Water Pumps and Heat Exchanger
Alteration
Results
$375,000 to $450,000 est. value
Columbia, SC 29229

Removal of Existing and Installation of New Condenser Units at Round Top Elementary School
Alteration
Post-Bid
$90,000 est. value
Blythewood, SC 29016

Last Updated 05/12/2023 01:03 PM
Project Title

Columbia Medical Center Northeast

Physical Address View project details and contacts
City, State (County) Columbia, SC 29203   (Richland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. The work under this Contract shall include all labor, materials, tools, equipment, transportation, insurance, temporary protection, supervision and incidental items essential for proper installation and operation, even though not specifically mentioned or indicated but which are usually provided or are essential for proper installation and operation of all systems related to this Section, as specified herein. 2. The specifications and drawings describe the minimum requirements that must be met by the HVAC Contractor for the installation of all work as specified here in under. 3. The systems shall be installed in accordance with the following criteria and system concepts: a. Every effort shall be made to design and lay out all equipment and systems in locations which will tend to encourage total flexibility for future, routing preventative maintenance by providing easy access for maintenance personnel. Manual isolation valves shall be provided to enable servicing, expansion of, renovation, or construction of any part of the new facility without interrupting the services in adjacent areas. b. A one (1) year guarantee covering all materials, equipment and workmanship from date of occupancy will be provided as determined by the Architect. Remove rooftop Air Handling Unit. Replace with new RTU as specified

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents