Similar Projects
On-Call HVAC Services
Post-Bid
Birmingham, AL 35255

Volker Hall, 5th Floor, Air Handler Replacement
Post-Bid
$210,000 to $245,000 est. value
Birmingham, AL 35233

HVAC Maintenance, Service and Replacement Project
Results
Dothan, AL

Coleman Coliseum Service Level HVAC Replacement
Results
$200,000 to $400,000 est. value
Tuscaloosa, AL

Chiller Maintenance Service Various Schools
Post-Bid
Mobile, AL 36618

Replacement of HVAC Units
Results
Selma, AL 36703

Tuscaloosa Fire Station #1 HVAC Upgrades Project
Post-Bid
Tuscaloosa, AL 35401

Marine AC Unit 30,000 BTU
Results
Huntsville, AL 35899

Capitol HVAC Repair and Controls Upgrade Capitol Operations
Post-Bid
Less than $850,000 est. value
Montgomery, AL 36130

Construction of the Bryant Denny Stadium Chilled Water Distribution
Results
Tuscaloosa, AL 35487

HVAC Condenser Unit Relocation at the HABD Elyton Village Housing Community
Post-Bid
Birmingham, AL 35233

Causey Middle School Chiller Change - Out
Results
Mobile, AL 36695

Cullman County Courthouse HVAC Replacement
Post-Bid
Cullman, AL 35055

Biomedical Research Building II, First Floor HVAC Improvement
Results
$65,000 to $85,000 est. value
Birmingham, AL 35233

Cleaning of Hoods and Vents
Post-Bid
Birmingham, AL 35294

Last Updated 01/09/2020 03:49 PM
Project Title

J--HVAC Units Replacement w/Connection to Siemens Building Automation System, Currently in Place at the Station.

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35404   (Tuscaloosa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall install 4 new HVAC units and controls and remove the old equipment and controls per the statement of work below: Contractor shall replace 4 existing attic HVAC units and corresponding rooftop condensing units serving the Building 5 Auditorium. Work shall be performed during normal business hours. All OSHAA and VA, NEC guidelines procedures to be followed including infection control procedures if needed. The General Contractor shall have on-site supervision during the performance of all work. Contractor shall replace 4 Chrysler Airtemp units in the attic of Building 5 with 4 Trane 10 ton Performance Climate Changers (Mod. UCCAA08AOC0EGU). Heating will be with a factory installed steam coils. Cooling will be DX, single stage. A new filter section shall be included. The Contractor shall install factory control devices, which shall include: low limit switch, condensate overflow switch, dirty filter switch, fan status switch, discharge temp sensor, mixed air temp sensor. Factory installed controls shall be wired to a terminal strip for use by controls contractor. New supply fan/coil/filter section shall be connected to the existing supply and return duct work. Existing duct work shall be cleaned and repaired as needed. Existing SA/RA/EA dampers shall be reused with new damper control actuators installed. Wiring shall be reconnected to both fan section and outside condensing units. Crane lift of the 4 old and new condensing units will be required. Crane lift plan and permits are required and shall be submitted to the assigned POC prior to performance of any type of service. The pneumatic controls shall be removed and replaced with 4ea Siemens PXC programmable controller connected to the campus wide BAS network. The 2 pneumatic thermostats in the auditorium will be replace with 2 blank electronic room sensors. Each sensor will control 2 or the supply units Contractor shall remove existing pneumatic controls (damper actuators, air compressor, steam valves controllers, PE, EP switches) and copper lines as much as possible. The Contractor shall install Controllers and connect new HVAC Units to existing campus-wide Siemens Building Automation System to include all wiring, engineering programming and graphics. Included controls: 4 Siemens PXC24 with Ethernet and LAN 16 Siemens electronic damper actuators, 0-10Vdc 4 Siemens Flowrite 1.5 steam valve with electronic actuator, 0-10Vdc 4 High temp detectors for fan shutdown 4 Enclosures, transformers, relays, and other materials Factory installed Trane devices shall be connected, wired, and programmed to the 4 controllers Controller programming and point database Graphics and programming and central mechanical plant and fire alarm system connection. Contractor shall remove 4 non-functioning line voltage Pyrotronics duct smoke detectors and dispose of properly, and seal duct penetrations. Contractor shall install Notifier FRN-1 relay on each existing notifier duct detector for supply fan shutdown and coordinate individual fan shutdown circuits with controls contractor and address and program relays into the existing Notifier fire alarm system. Contractor shall follow all OSHA, VA and NEC Guidelines and Regulations including Infection Control Procedures.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents