Similar Projects
Existing Pre-K, Elementary, Middle and High Schools Renovations & Additions
Renovation, Addition - 27,100 SF
Conception
Cadet, MO 63630

New Elementary School
New Construction
Conception
Columbia, MO 65203

Multiple Construction Projects
Renovation
Design
$300,000 est. value
Oak Hill, MO

Engineering Works
Renovation
Design
Clarkton, MO

Proposed Building Addition for Milan Elementary School
Addition, Demolition, Infrastructure - 5,500 SF
Bidding
$1,100,000 CJ est. value
Milan, MO 63556

PS1 - Tornado Shelter & Classroom Addition to Primary School
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Rogersville, MO 65742

Fulton 58 School District-Secure Vestibule Upgrades
Renovation
Post-Bid
Fulton, MO 65251

Woodland Elementary School Phase II
Renovation
Post-Bid
Kansas City, MO 64106

McGrath Elementary School And ECC: Building Package (Phase 1)
New Construction
Results
Brentwood, MO 63144

McGrath ES and ECC Building Package (Phase 1)
New Construction
Results
$15,000,000 to $16,000,000 est. value
Brentwood, MO 63144

Ladue Old Bonhomme Elementary
Renovation
Construction
Saint Louis, MO 63132

Briarcliff Elementary
Renovation, Addition - 10,300 SF
Construction
Kansas City, MO 64116

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Holy Cross - Bright Futures Academy
Addition, Demolition, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Kansas City, MO 64123

New Elementary School
New Construction
Conception
Columbia, MO

Last Updated 12/12/2022 03:04 PM
Project Title

Wright City High School Addition

Physical Address View project details and contacts
City, State (County) Wright City, MO 63390   (Warren County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $55,048,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

New High School and East Addition. New High School location: 159 Roelker Road, Wright City, MO 63390 East Elementary School location: 3675 West Meyer Road, Foristell, MO 63348 These documents constitute an Invitation to Bid to and request for qualifications from General Contractors for the construction of the projects described below. Both projects may be bid together or bid on separately. The school District can award separate contractors for each project, if the costs are more favorable that way Summary Project Description: New ground up 125,000 sf one story high school with gym as a storm shelter, classrooms, library, cafetorium, kitchen, site work, and athletics. Football soccer stadium bas bid: Grass turf fields, fence and gates, stairs to plaza, football goal posts, Site grading and drainage. Football Alt #1: Filled turf field and drainage, subsurface compacted fill and rock, sports Turf (Shaw Legion 2.0 hybrid synthetic turf system) over shock pad (Shaw Nxtplay), urethane rubber track with poured rubber over asphalt, sprayed red top coat, home bleachers concrete supports and bleachers on sloped hill, relocated visitor bleachers from existing stadium on new concrete slab, press box, storage shed, paved sidewalks, throwing fields for track, scoreboard, electrical service and panels, Data/fiber connection, A/V rack, water supply, flag pole, stadium lights. Performance Gym Alt #2: Full high School performance style gym, sports performance wood flooring, fold away basketball goals, electronic scoreboards, locker rooms, restrooms, lobby, canopy, concession stand, signage, A/V rack and system for public address and music. Baseball base bid: Grass turf, rock parking and walkways, masonry backstop, fencing and gates, dugout fenced, site grading, and drainage. Baseball Alt #3: Filled turf infield and drainage, subsurface grading, compacted rock and fill, sports Turf (Shaw Truhop 46 synthetic turf system infield) grass outfield, Field sports lights, building lights and parking lights, bullpen and soft toss areas, concession, 2 restrooms, press box, dugouts, storage, scoreboard, concrete pads for bleachers and tip and roll bleachers, electrical service and panels, Data/fiber connection, A/V rack, forced main and pump/grinder, water supply, paved parking lots and concrete walkways and pavement. Summary Project Description: 4 Classroom addition to East Elementary School of approximately 5,300 sf. The addition will include a pair of restrooms, storage and corridor to classrooms. The addition will be designed as a storm shelter for everyone on the campus. Required Substantial Completion Date for the High School: Not later than November, 2024. Required Substantial Completion date for the Addition to East Elementary School: No later than August 2024. All bidders in response to this bid shall provide as a security a bid bond or certified check in an amount not less than five percent (5%) of the base bid amount. All bid guarantees shall be drawn payable to the Owner and must be submitted with bid as guarantee that Bidder will promptly enter into a contract and execute such bonds that are required if awarded to the contractor. Failure of successful bidder to furnish any required Performance and Payment Bonds will result in forfeiture of the Bid Guarantee. The contractor awarded the project shall furnish to the Owner a Performance guarantee in an amount equal to 100% of the contract sum. Payment Bond - the Contractor shall furnish to the District a labor and materials payment bond acceptable in the amount equal to 100% of the total contract sum. All guarantees will contain provisions guaranteeing faithful performance of the prevailing wage requirements set forth. Guarantees shall be furnished prior to starting the project. The guarantees shall be in the form of a Bond or Certified Check. Said guarantee shall provide that it will not be cancelled, materially altered or changed for the contract period. Please note that Missouri's Prevailing Wage Law establishes a minimum wage rate for public works projects in Missouri valued over $75,000. If the project is over $75,000, the wage rates applicable to this project have been predetermined as required by law and are set forth in this specification. Effective January 1, 2009, and pursuant to RSMo 285.530 (1), No business entity or employer shall knowingly employ, hire for employment, or continue to employ an unauthorized alien to perform work within the state of Missouri. The successful bidder must submit a sworn affidavit and documentation affirming the business entity's enrollment and participation in the federal work authorization program and that all of its employees working for the contracted services are not illegal immigrants. Upon signing the contract, the successful contractor and any subcontractor performing the work shall provide a ten- hour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees. The Wright City R-II School District hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The Owner reserves the right to change the schedule or terminate the entire procurement process at any time *As of November 14, 2022, addendum 4 has been issued. 2022-0246.10, 2021230.02, 20034

Details

,, 130,300 SF - 5,300 SF. 1 Story Above Grade, 125,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents