Similar Projects
Last Updated 09/24/2019 11:42 AM
Project Title

Degasifier No. 3 Media Replacement at the City of Miramar's West Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Miramar, FL   (Broward County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Remove, replace and test the media inside the degasifier no. 3. The degasifier has a treatment capacity of 5.9 MGD, with a tower diameter of 12 feet and a packing height of 13 feet. The maximum water loading rate is 37 gpm/ft2 and the minimum air to water ratio is 22.1 cfm air/ cfm water. Each degasifier blower unit has a capacity of 16,000 cfm.
Details
Division 46 - Water and Wastewater Equipment, Filtration Equipment, Filter Media.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents