Similar Projects
Last Updated | 09/24/2019 11:42 AM |
Project Title | Degasifier No. 3 Media Replacement at the City of Miramar's West Water Treatment Plant |
Physical Address | View project details and contacts |
City, State (County) | Miramar, FL (Broward County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove, replace and test the media inside the degasifier no. 3. The degasifier has a treatment capacity of 5.9 MGD, with a tower diameter of 12 feet and a packing height of 13 feet. The maximum water loading rate is 37 gpm/ft2 and the minimum air to water ratio is 22.1 cfm air/ cfm water. Each degasifier blower unit has a capacity of 16,000 cfm. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |