Similar Projects
US-51 Drive Through Restaurant
New Construction, Infrastructure - 5,760 SF
Conception
$1,750,000 CJ est. value
Stoughton, WI 53589

Starbucks
Build-Out
Design
Deforest, WI 53532

Popeye's - State Highway 138
New Construction
Design
$770,000 est. value
Stoughton, WI 53589

815 Cedar Street Development
New Construction - 24,000 SF
Post-Bid
$43,000,000 est. value
Madison, WI 53715

Burger King Pavilion #21006
New Construction, Demolition - 3,262 SF
Post-Bid
Middleton, WI 53562

Wendy's
Build-Out
Construction
Deforest, WI 53532

Tavern Barcelona
Renovation - 11,671 SF
Pending Verification
$1,820,000 CJ est. value
Madison, WI 53713

East Olin Ave- Mixed Use Development
New Construction, Demolition - 12,500 SF
Design
$115,000,000 est. value
Madison, WI 53713

Burger King
New Construction - 3,262 SF
Post-Bid
$1,100,000 est. value
DeForest, WI 53532

Pizza Hut Redevelopment
Demolition, New Construction, Infrastructure - 1,512 SF
Design
$2,500,000 CJ est. value
Madison, WI 53717

Eno Vino Bistro
Renovation - 5,005 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Beloit, WI 53597

State Street Mixed Use
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Madison, WI 53703

Jamba/Auntie Anne's
Build-Out - 1,918 SF
Post-Bid
Madison, WI 53703

Starbucks Shell
New Construction - 2,399 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Verona, WI 53593

Milio's
Build-Out - 1,386 SF
Post-Bid
$169,000 to $179,000 est. value
Stoughton, WI 53589

Last Updated 09/02/2022 03:03 PM
Project Title

Water Street Tavern Expansion

Physical Address View project details and contacts
City, State (County) Stoughton, WI 53589   (Dane County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for adding a walk in cooler and storage space to a restaurant. As of September 2, 2022, this project has obtained site plan approval. Information regarding the selection of an architect and general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents