Similar Projects
Trailside at Everett Park Phase II
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
South Haven, MI 49090

Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

Concrete Shared-use Path, Curb, Gutter, Sidewalk and Ramps, Storm Drain and Pavement Markings on Woodward Avenue
Infrastructure
Design
$2,739,086 CJ est. value
Pleasant Ridge, MI 48069

Bus Garage and Office Construction
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Bangor, MI 49013

Great Lakes Bay Regional Trail - Dow Non-Motorized Path
Infrastructure
Bidding
$700,000 CJ est. value
Midland, MI 48640

Joe Louis Greenway- Site Construction 2021
Infrastructure
Post-Bid
Detroit, MI

I-75 Reconstruction
Infrastructure
Post-Bid
MI

Storage Lagoon 4 Liner Repair
Results
Hart, MI

Chapaton Basin and 9 Mile Emergency Bypass Sewer Structural Repairs
Results
Clinton Township, MI

Remove and Replace Sidewalks
Infrastructure
Construction
$200,000 CJ est. value
Highland Park, MI 48203

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Boston Square Community Hub
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Grand Rapids, MI 49507

Pedestrian Tunnel Replacement (underneath South Lakeshore Drive) - Lakeshore Park - ENG084 - City of Novi
Alteration
Conception
$507,530 est. value
Novi, MI 48377

West Winds Condominium (Stony Brook Phase III)
New Construction, Infrastructure
Design
$51,000,000 CJ est. value
Fenton, MI 48430

Last Updated 09/08/2022 12:03 PM
Project Title

Dowagiac River Restoration Phase 2

Physical Address View project details and contacts
City, State (County) Dowagiac, MI 49047   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Pokagon Band is seeking proposals for the restoration of meanders to the Dowagiac River. This construction is set to begin in the late fall and winter of 2022-2023 Dowagiac River Bid Package In general, this project, located on the Dowagiac River, includes channel construction and large wood installation to restore the Dowagiac River. The work includes, but is not limited to, the following: 1. Access development and erosion, sediment, pollution and water control. 2. Clearing and large wood salvage. 3. Earthwork to excavate the proposed river channel and fill the existing river channel 4. Installation of cribwalls and floodplain large wood structures to stabilize bank and floodplain areas. 5. Installation of grade control riffles. 6. Installation of fabric encapsulated soil lifts and surface fabric bank treatments 7. Planting, seeding, and site restoration.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents