Similar Projects
ShipBob Fulfillment Centers Master Plan
New Construction
Conception
Chicago, IL 60607

Retail & Warehouse
New Construction
Conception
Chicago Ridge, IL 60415

Compass Global Logistics Hub
New Construction
Design
$1,700,000,000 est. value
Joliet, IL 60436

Amazon Warehouse
New Construction - 112,000 SF
Design
Chicago, IL 60654

SMTD Bus Storage Building
Renovation
Bidding
$150,000 est. value
Springfield, IL

Street Department - Salt Storage Building
New Construction
Bidding
$3,000,000 est. value
Fairfield, IL

Cold Storage Building
Post-Bid
Vermilion, IL 61955

MCC Storage Building
New Construction
Post-Bid
Lombard, IL

Roosevelt And Kostner Development
New Construction
Results
Chicago, IL 60624

DNR-Rock Cut-Storage Building
Results
Loves Park, IL 61111

LogiPark 57-80 Distribution Warehouse
New Construction - 2,400,000 SF
Construction
$10,000,000 CJ est. value
Country Club Hills, IL 60478

Ricky Rockets Fuel Center & Retail
New Construction, Demolition - 117,270 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Buffalo Grove, IL 60089

Storage Facility Renovation
Renovation, Addition - 5,500 SF
Pending Verification
$150,000 est. value
Alton, IL 62002

Abt Electronics Warehouse Expansion
Addition - 429,524 SF
Pending Verification
Glenview, IL 60025

Signode Corporate Headquarters
Renovation, Build-Out - 253,000 SF
Conception
$15,000,000 est. value
Elk Grove Village, IL 60007

Last Updated 06/22/2022 04:05 PM
Project Title

Storage Buildings

Physical Address View project details and contacts
City, State (County) Farmington, Lewistown, Wyoming, IL (Fulton, Stark Counties)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $1,840,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Farmington Storage Building will be new site for newly created heated material and equipment storage building. The scope of work at this location consists of demolishing the existing building and replacing it with a heated material and equipment storage building, including a restroom. The scope also provides for septic services for the restroom. This work may include, but is not limited to architectural, geotechnical, civil, structural, electrical and mechanical services. Lewistown Equipment Storage Building (D0410), 3,024 SF, one-story building. The scope of work provides for relocating the existing shed on site and constructing approximately 4,000 SF heated equipment storage building. This work may include, but is not limited to, architectural, geotechnical, civil, structural, electrical and mechanical services. Wyoming Equipment Storage Building (D0454), 4,224 SF, one-story building. The scope of work provides for demolishing and replacing the building with a partially enclosed equipment cold storage building. This work may include, but is not limited to architectural, geotechnical, civil, structural and electrical services.

Details

7,248 SF - Warehouse/Storage, 3,024 SF New Construction, Warehouse/Storage, 4,224 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents