Similar Projects
Olmsted County Justice Center Remodel - Mechanical and Plumbing Package
Alteration
Bidding
Rochester, MN 55904

2020-2021 Contract Plumbing Services
Term Contract
Post-Bid
Minneapolis, MN

Mechanical Pipefitting for All MCES Locations
Term Contract
Post-Bid
MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Dassel-Cokato HS- Pool Area HVAC and Plumbing Renovations
Results
Cokato, MN 55321

Hastings HS Valve & Fitting Replacement
Post-Bid
Hastings, MN 55033

Plumbing Service
Term Contract
Results
$250,000 est. value
Moorhead, MN

Water Softener Installation
Post-Bid
Faribault, MN

Victaulic Piping Replacement
Results
$863,000 est. value
MN

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Post-Bid
Duluth, MN 55802

Mechanical and Plumbing Installation, Maintenance and Repair
Results
Less than $25,000 est. value
Rochester, MN

2022 Seasonal Work and Materials
Term Contract
Post-Bid
Faribault, MN

Lincoln ES Domestic Piping Replacement
Results
White Bear Lake, MN 55110

Mechanical Pipefitting Services for all MCES Facilities
Alteration
Post-Bid
MN

John Rich Fountain
Alteration
Results
Red Wing, MN 55066

Last Updated 01/07/2022 10:19 AM
Project Title

General Contractor for 1314 North 44th Avenue Piping

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55412   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace sanitary drain and vent piping and domestic waterlines and associated components, set up and install new refrigerators in resident units including proper removal of existing refrigerators, remove and replace bathroom flooring and vinyl base, refurbish existing kitchen cabinets and install FRP panel in sink base cabinets, wall patching, taping of new walls, and paint throughout resident units including walls, ceiling, interior apartment doors and frames, and interior side of unit entry door frames, install new fire suppression system, final clean refurbished resident units including stoves, window cleaning of both sides of removable window panels, and inside of fixed window panels, asbestos abatement.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents