Similar Projects
Pavement Resurfacing Including Sidewalk Ramps
Infrastructure
Bidding
NY

Highway
Infrastructure
Bidding

Providing Hot Mix Asphalt
Post-Bid
Goshen, NY 10924

Wallkill Valley Rail Trail Improvements
Post-Bid
Rosendale, Ulster, NY

Design Build Services for I 390/I 490/31 (Lyell Ave) Interchange Improvements Phases 3 and 4
Term Contract
Results
Less than $85,000,000 est. value
NY

Lauderdale Drainage and Waterproofing
Results
Geneseo, NY 14454

Repair Replacement of 7 Large Culverts at Various locations in Region 2
Infrastructure
Bidding

Paving Work to the Parking Lot and Response Area
Post-Bid
Sparkill, NY 10976

Cold Milling and Crushing/Screening of Asphalt Pavement
Results
NY

Removal of Roadway Millings
Infrastructure
Bidding
Armonk, NY 10504

Koons Avenue New Construction and Various Street Rehabilitation - Group 991
Post-Bid
Buffalo, NY 14202

2020 Village Road Improvements Phase I
Results
Menands, NY 12204

Orange Street and Saxton Street Rehabilitation Project
Infrastructure
Bidding
$1,422,400 est. value
Rochester, NY 14611

West Pointe Marina Seawall (REDI MO 18)
Post-Bid
Rochester, NY 14612

Paving Project - Shepard Parking Lots 7A and 7B
Results
Middletown, NY 10940

Last Updated 10/27/2021 08:25 AM
Project Title

East Monroe Street and Industrial Park Drainage/Roadway Improvements

Physical Address View project details and contacts
City, State (County) Little Falls, NY 13365   (Herkimer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids are requested for the following Contract: East Monroe Street and Industrial Park Drainage/Roadway Improvements, SFY 2021-2022 TR/CHIPS/PAVE NY/EWR. The Project includes the following Work: Paving, isolated pavement re-construction areas, milling and filling approximately 4,850 linear feet of East Monroe Street and Industrial Park, 5 catch basins, selective demolition, approximately 2,480 linear feet of concrete gutter, 12 single aisle ADA compliant handicap ramps and associated work. Portions of the work have a November 18, 2021 substantially complete deadline (East Monroe) except the 12 handicap ramps and the remaining work having a substantially complete deadline of June 21, 2022 (Industrial Park and East Monroe handicap ramps). The City of Little Falls DPW will provide trucking (three (3)) for asphalt millings and take possession of milling materials for future work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents