Similar Projects
Lift Station #8 - Upgrade Automated Rotating Screen - City of Emporia
Renovation
Conception
$500,000 CJ est. value
Emporia, KS 66801

Realign Sewer Main Along South Avenue - City of Emporia
Infrastructure
Conception
$4,000,000 CJ est. value
Emporia, KS 66801

David Traylor Zoo Education Center Expansion and Renovation
Addition, Renovation, Infrastructure
Design
$1,000,000 CJ est. value
Emporia, KS 66801

David Traylor Zoo North American River Otter Exhibit
Addition, Infrastructure
Design
$1,000,000 CJ est. value
Emporia, KS 66801

Pin Tail March Rehab
Infrastructure
Post-Bid
$150,000 CJ est. value
Hartford, KS 66854

12th Avenue Waterline Improvements
Infrastructure
Results
Emporia, KS

Emporia Raw Water Intake Site Improvements
Infrastructure
Results
Emporia, KS

Watermain Project Lincoln - 24th to Briarcliff - City of Emporia
Infrastructure
Conception
$575,000 CJ est. value
Emporia, KS 66801

Lift Station No. 2 Improvements
New Construction
Results
Emporia, KS

Watermain Project South East Trans - West to Neosho to South - City of Emporia
Infrastructure
Conception
$1,940,000 CJ est. value
Emporia, KS 66801

6th Avenue Waterline Improvements
Infrastructure
Results
Emporia, KS

Watermain Project Peyton Street ( Water Tower to 12th and 6th to South Avenue Peyton to Carter ) - City of Emporia
Infrastructure
Conception
$1,750,000 CJ est. value
Emporia, KS 66801

Highland Street CDBG Improvements (12th Avenue to 16th Avenue )
Infrastructure
Results
$1,280,401 CJ est. value
Emporia, KS 66801

South Union to South Exchange From Kansas to Potwin - City of Emporia
Infrastructure
Conception
$350,000 CJ est. value
Emporia, KS 66801

New Shop and New Bridge Department Facilities
New Construction, Infrastructure
Results
$4,876,000 CJ est. value
Emporia, KS 66801

Last Updated 01/05/2023 02:40 AM
Project Title

Repair or Replace Force Main Lift Station 8 - City of Emporia

Physical Address View project details and contacts
City, State (County) Emporia, KS 66801   (Lyon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been determined. This project is in included in the City of Emporia FY 2023 - 2027 CIP. As of January 05, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents