Similar Projects
Replace Superstructure
Demolition, New Construction, Infrastructure
Conception
$747,338 CJ est. value
Anderson, IN 46011

Replace Superstructure
Demolition, New Construction, Infrastructure
Conception
$747,338 CJ est. value
Anderson, IN 46011

Bridge Deck Overlay - US 36
Infrastructure
Design
$341,643 CJ est. value
Anderson, IN 46012

Bridge Deck Overlay - US 36
Infrastructure
Design
$341,643 CJ est. value
Anderson, IN 46012

Replace Superstructure
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Anderson, IN 46013

Replace Superstructure
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Anderson, IN 46013

Resurfacing of the Following Streets with Asphalt
Infrastructure
Post-Bid
Summitville, IN 46070

Community Crossings Matching Grant 2021 Round 1 Road Improvements
Infrastructure
Post-Bid
Lapel, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Madison County Bridge No. 88 Replacement
Results
Anderson, IN

Madison County Jail
New Construction, Infrastructure - 106,000 SF
Pending Verification
$87,000,000 CJ est. value
Anderson, IN 46016

PRESS - Rehabilitate Taxiway - Anderson Municipal Airport
Infrastructure
Conception
$570,950 est. value
Anderson, IN 46017

Small Structure Replacement - SR 128
Infrastructure
Design
$424,920 CJ est. value
Frankton, IN 46044

Madison County 2021 Annual Paving in Various Townships
Infrastructure
Post-Bid
IN

Alexandria Pavement Improvement
Results
Less than $750,000 est. value
Alexandria, IN

Last Updated 12/05/2022 10:33 PM
Project Title

Replace Superstructure

Physical Address View project details and contacts
City, State (County) Anderson, IN 46012   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,960,284 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CR 200S OVER I-69, 02.70 miles S of SR 67 Limits From to of Distance (mile) 0 Milepost begins at ends at As of December 06, 2022, the project is in Final Planning status. Anticipated Letting date is November 16, 2022. INDOT - Replace Superstructure *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents